Loading…
Loading…
20,919 results • Best match
Construction of R.C.C. Ramp and Vedio Confrencing Room at 1st Floor vikas Bhawan Mainpuri
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. DSR NO 15.7.4
Construction of 1.5 km, 33kV line to Elamkulam SS using XLPE CCSX 120sqmm AAAC CC, except stringing (Retender)
DSR_2.9.1 - 2.9.1 : Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock (cost index(c) : 1.3268 included in Rate)
Memo No. 8743/NKDA/Engg /EE(RandB)/416/2025 - Renovation and Remodeling of Badminton Court at New Town Business Club under NKDA
... film thickness and specified colour / natural mat finished conforming to IS1868-1983 for fabrication of structural glazing, curtain wall formed of basic section of any ISI embossed / certified make and... direction of Engineer-in-Charge. (Payementwill bemade on finished length of thework). for Structural glazing/curtain wall with 15 micron Coloured Anodising. (i) Fixing Plate (Wt. @ 0.515 ...
Routine Maintenance works of FPSM for 365 days
Charges for carrying out the daily, routine and breakdown maintenance of Mechanical equipments and its auxiliaries in Fire water pump house, Foam Pump House, Fire Hydrant... Pump House, Fire Hydrant Booster Pump House such as Pumps, Diesel Engines, Valves and pipes, Compressors and tanks, Diesel tanks, Hoist/Cranes etc., painting the equipments and ...
BOQ
Carriage of Sand from Source to site of work by Mechanical transport including loading /Unloading complete for an avg distance of 150 km by MT & 500Mtr by H/L
District-Construction work of non-residential building of District Rural Development Institute in District-Chitrakoot.
SUB HEAD-I :- EARTH WORK Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sgm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.