Loading…
Loading…
20,928 results • Best match
District-Construction work of non-residential building of District Rural Development Institute in District-Chitrakoot.
SUB HEAD-I :- EARTH WORK Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sgm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.
Cutting in earth work in RD 0/0 to 1/210
Cutting in earth work in all depths and heights in all kinds of soils including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock, with chiseling and wedging out of rock. (where blasting is ...
Restoration work of Lower side of Retaining wall for Centre Store of Bassi Power House adjoining to Neri Khad, retaining wall of Sub-ordinate Rest House, washed away during the heavy rain under Bassi Power House Division, HPSEBL, Joginder Nagar.
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. in Ordinary rock
Permanent Restoration of road from Saj to Basan upto Kaiyan under UT Capex road Sector of capex budget 2025 26 3rd call
Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete.
Construction of lane from Eden Farm to house of Vijay Kumar Sharma, W.No. 10, Pyt. Jagti, Block Nagrota Under scheme MPLADS For the year 2025-26 1st Call
Carriage of key construction material from source to site of work by Mechanical Transport: Sand & Agg.avg. 10.0 km lead by MT
Construction of Wire Mesh like Structure at different locations of Rajouri Town 2nd Call
Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete.