Loading…
Loading…
20,919 results • Best match
REMAINING WORK OF TEEN SHAD AND FLOORING ETC. IN NORTH SIDE UNSTABLE GAUSHALA BISANDA
S/F of M.S. square pipe 100x100x5 with fabrication work for truss AS PER M.R.
Day to Day Maintenance of General Electrical Installation in West Campus at IIT Delhi (For 02 years).
Day to Day Round the clock (24 Hours, 7 days) Operation & Maintenance of Electrical & Mechanical installation Routine, Preventive & Minor Breakdown Maintenance of General Electrical & Mechanical Service in Sports Play Grounds, Faculty Guest House, RCA, IIT Hospital, Central Store, ...
Construction of 200 mm / 165 mm dia, 270 Mtrs. av. deep HYDT with Installation of 2HP Electric Motor Pump Nav P.V. Kamalghati, Muslim Tola, Panchayat Kamalghati, Block-Littipara in the District of Pakur Group No LTP-02
Electro Mechanical Work 2 HP Electric Submersible motor Pump Set- Supplying and installation of 100mm dia submersible... with stsinless steel pumps shall and poly-propylene noryl. impeller motor suitable for working on 415V+ 10% 3PH, 50 Hz, AC, Supply with cable guard, thrust carbon fiber bearing to ...
Development Of an Open Car Park in Botanical Garden at Fancy Bazar, Guwahati
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.
PROVN OF ARTIFICIAL RECHARGE STRUCTURE FOR RAIN WATER HARVESTING UNDER JAL SHAKTI ABHIYAN AT REAR OF MILKHA SINGH COLONY SARABJIT SPORTS COMPLEX ROBERT EAST BEHIND MCEME KOTE AT FEMT AND NEAR BSO OFFICE AT GURUVAYUR ENCLAVE OF GE MCEME
M&L for Earth Work Excavation by Mechanical Means (Hydraulic excavator) Over Areas (exceeding 30 cm in depth) in any kind of soil including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, Complete all as Specified and Directed by Engineer-in-Charge.
147. Construction of anganawadi building in ward 3 in Moonniyur GP
OD414243/2025-2026:Demolishing Laterite/brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar