Loading…
Loading…
563 results • Best match
ROAD WORK
Quarrying, collecting, supplying hard granite stone boulder of size not less than 0.0025 cum from approved quarry free from weathered skin surface and other deleterious materials, packing the stones in rip raps and slope protection works in the river embankment to required profiles in all heights and depths including filling the interstices with small stones , wedging and hammering etc including cost, conveyance, labour, T and P required for the work, royalty, taxes, cess, hire and running charges and transportation of all materials of approved quality with uniform colour and texture with all leads, lifts, delifts handling with uniform colour and texture with all leads, lifts and delifts handling and rehandling etc including all other incidental charges required to complete the works as per specification and direction of the Engineer-in-charge.
EMBANKMENT work
Quarrying, collecting, supplying hard granite stone boulder of size not less than 0.0025 cum from approved quarry free from weathered skin surface and other deleterious materials, packing the stones in rip raps and slope protection works in the river embankment to required profiles in all heights and depths including filling the interstices with small stones , wedging and hammering etc including cost, conveyance, labour, T and P required for the work, royalty, taxes, cess, hire and running charges and transportation of all materials of approved quality with uniform colour and texture with all leads, lifts, delifts handling with uniform colour and texture with all leads, lifts and delifts handling and rehandling etc including all other incidental charges required to complete the works as per specification and direction of the Engineer-in-charge.
Embankment work
Quarrying, collecting, supplying hard granite stone boulder of size not less than 0.0025 cum from approved quarry free from weathered skin surface and other deleterious materials, packing the stones in rip raps and slope protection works in the river embankment to required profiles in all heights and depths including filling the interstices with small stones , wedging and hammering etc including cost, conveyance, labour, T and P required for the work, royalty, taxes, cess, hire and running charges and transportation of all materials of approved quality with uniform colour and texture with all leads, lifts, delifts handling with uniform colour and texture with all leads, lifts and delifts handling and rehandling etc including all other incidental charges required to complete the works as per specification and direction of the Engineer-in-charge.
Facility Management Services - LumpSum Based - SECL GEVRA AREA; Deployment of 03 Nos Vehicle Mounted Silent DG Sets (15 KVA Rating) at Quarry mines premises for day to day E&M related work for a period of 365 Days at Gevra Project; Cost of consumable..
Facility Management Services - LumpSum Based - SECL GEVRA AREA; Deployment of 03 Nos Vehicle Mounted Silent DG Sets (15 KVA Rating) at Quarry mines premises for day to day E&M related work for a period of 365 Days at Gevra Project; Cost of consumable..
EMBANKMENT WORK
Quarrying, collecting, supplying hard granite stone boulder of size not less than 0.0025 cum from approved quarry free from weathered skin surface and other deleterious materials, packing the stones in rip raps and slope protection works in the river embankment to required profiles in all heights and depths including filling the interstices with small stones , wedging and hammering etc including cost, conveyance, labour, T and P required for the work, royalty, taxes, cess, hire and running charges and transportation of all materials of approved quality with uniform colour and texture with all leads, lifts, delifts handling with uniform colour and texture with all leads, lifts and delifts handling and rehandling etc including all other incidental charges required to complete the works as per specification and direction of the Engineer-in-charge.
Evacuation of 2.50 lakh CuM pond ash including eco-friendly transportation and eco-friendly disposal at a distance of 20 km and beyond from the allocated evacuation site of Ash Pond of Bakreswar Thermal Power Station.
Evacuation of pond ash at BkTPS, WBPDCL from either Ash Pond-I, Ash Pond-II, or both, depending on the availability of the ponds for evacuation (with the site handover at Ash Pond-I & II being at the sole discretion of BkTPS, WBPDCL and the agency being required to accept the same) by deploying excavating machineries and other accessories including loading into dumpers at work site and unloading in eco-friendly manner at approved prescribed avenue of MOEF&CC at a distance of 20 km and beyond from the allocated evacuation site including lift and lead at both loading and unloading points, as per direction of the EIC. The avenue prescribed by MOEF & CC (i) Fly ash based products (bricks or blocks or tiles or fibre cement sheets or pipes or boards or panels); (ii) Cement manufacturing, Ready mix concrete; (iii)Ash and Geo-polymer based construction material; (iv) Manufacturing of sintered or cold bonded ash aggregate; (v) Construction of roads, road and flyover embankment; (vi) Filling up of low lying area;(vii) Filling of mine voids; (viii) Use in overburden dumps; (ix) Construction of shoreline protection structures in coastal districts. The agency must take prior permission from BkTPS as well as from State Pollution Control Board (SPCB) of the state for filling up of low-lying area; filling of mine voids; use in overburden dumps before disposal of pond ash in this avenue. Necessary official correspondence, if required, will be made by BkTPS. [Deduction in Contractual rate: If the evacuated pond ash is disposed of at a location within 20 km, a deduction of Rs. 7.00 per cubic meter (cum) to be applied for each kilometre short of the 20 km distance. This deduction will be calculated on a pro- rata basis and adjusted against the final contractual rate].