Loading…
Loading…
457 results • Best match
Pakka Work Anicut, Pakka Check Dam, Anicut Renovation and Recharge Shaft for Aquifers , Total 23 Works, GP Chiklad, Devpura,Devgarh, Gyaspur, Block Dhamotar MJSA2.0, II Phase
... in all types of soils and overburden including lowering of casing ...
Strengthening of strata and ground improvement works including channelization of leakage water flowing out from HRT of MB II HEP at Gamri Gad Distt Uttarkashi
... minimum 230KN in soil / overburden/ rock suitable for drillin ...
Construction of Darangapada Check Dam near village Darangapada of Tunmura GP in Kutra Block of Sundargarh District under MATY 2026-27
... finised level section).(Overburden cutting)
Earth work, Concrete work
... Stone Dry Packing including Quarrying, Collection & Supplying ...
Pakka Work- Anicut, Pakka Check Dam, Recharge Shaft and Rooftop Water Harvesting Structure, Total - 18 Works, GP- Bambori, Khoriya, Meriyakhedi, Block- Dhamotar (MJSA-2.0, III Phase, State Fund)
... in all types of soils and overburden including lowering of casing ...
Improvement to Canal Service Road
Quarrying, collecting, supplying and ...
Construction of a new Aqueduct on Surali khadi in place of existing Structure at Ch. 9050 mt of Ukai Right Bank Main Canal.
123.69 M3 Quarrying, transporting and laying inclined or horizontal sand filter for earthen dam 443.8 Rupees Four Hundred M3
Earthwork and Concrete work
... Stone Dry Packing including Quarrying, Collection & Supplying ...
Special Repair of Bridges at km 59.100 to km 95.600 of Mangaon Tamhini Ghat section of NH-753F in the state of Maharashtra during 2026-27
... 76/51/38/32/25 in Rock / overburden including all cost of material ...
Earth work, Bridge work
... Stone Dry Packing including Quarrying, Collection & Supplying ...