Loading…
Loading…
2,034 results • Best match
INSTALLATION AND ENERGISATION OF MADHYASASANA VI TW LI PROJECT
Miscellaneous item like cleaning of site, overburden earth cutting etc
INSTALLATION AND ENERGISATION OF SIRASTA II TW LI PROJECT
Miscellaneous item like cleaning of site, overburden earth cutting etc
INSTALLATION AND ENERGISATION OF RAGHUNATHPUR V TW LI PROJECT
Miscellaneous item like cleaning of site, overburden earth cutting etc
INSTALLATION AND ENERGISATION OF PATKURA IV TW LI PROJECT
Miscellaneous item like cleaning of site, overburden earth cutting etc
Building Work
Sinking of tube well(200) for PIT Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only Drilling of 200mm dia bore 00 mtr to 25mtr
Construction of Transit House at Khandapada
Sinking of tube well(200/150) Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only