Loading…
Loading…
2,208 results • Best match
PM- Usha Grant- Construction of a dedicated building for FYUGP and Integrated programs at Mahatma Gandhi University, Priyadarsini Hills Campus, Kottayam- Phase I
OD347115/2025-2026 Suplying and Laying of Single Mode Optical Fibre Cable (3C x 1.5mm) Finolex or Equivalent
Composite work of development of internal infrastructure for proposed DAE Exhibition Centre-cum-Science Museum including Civil, Electrical, Mechanical, LAN, AV, CCTV and other allied works in Apsara building, South site, BARC, Trombay, Mumbai.
Supply, Installation, Testing and Commissioning of "24 core Optical fibre cable on wall/Trench/MS Support etc" having specifications and requirements as per LANTSS12
Construction of New High Court at Rakh-i-Gund Aksha,Bemina Srinagar by way of Electrical and allied work Phase-I
Supplying & Fixing of Fiber Optic Patch Cable (LC-LC), 3 Mtrs. Long, ISO/IEC-11801-OM3 50μ Duplex, LSZH,All patch cords shall conform to EIA/TIA-568C.3 and ISO/IEC-11801,Shall be Duplex Multi Mode Fiber Optic Patch Cords OM3 50μ,Shall support network line speeds up to 10 Gbps.Shall have LC-LC Connector connectors at the ends complete in all respect.. Make-Siemon/Panduit/Legrand
Providing Interior Works (viz. cabin, storage rack, and furniture) to the SE, MLI Circle Office Complex at Takkalaki Village in B.Bagewadi Taluk of Vijayapur District
... lead and lifts and as per direction of engineer in charge. • Lens type: Auto focus with Optical Zoom of 30x, Digital Zoom +10x • Pan Angle: 360 degree endless • Tilt Angle: 210 degree with e-flip or higher • Zoom : 30x Optical and 12x Digital • Mode :Day and Night • Image size: Full HD • Streaming: High speed • ...
GENERAL-Construction of New BTS garage and Compound wall In KSRTC KayamkulamConstruction of New BTS garage-Composite Work-.-Composite Work
OD283753/2025-2026:Supply, laying, splicing and termination of 6 core armoured single mode optical fiber cable including testing charges :Accepted Make:- Finolex, Molex
Augmentation of Network Infrastructure at HWB HWPs and HWBFs
Installation of all Active Networking Devices for LAN-1, LAN-2 & VC Network along with all requisite mounting and cabling accessories. Laying of OFC & UTP Cable, Requisite casing capping and installation of I/O ports & power points shall be covered in separate contract by respective site.