Loading…
Loading…
15,370 results • Best match
Painting and distempering of Bldg No AR/NPCCL/Adm/54 (Office Bldg) at BN HQ at Maram
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work
Annual Plan-CLRA GP Pr No 282 2025-26 Chalavra Take A Break - Painting Name Board Ladder
Work Name:Annual Plan-CLRA GP Pr. No. 282/25-26 Chalavra Take A Break - Painting Name Board Ladder-Chalavra Take A Break - Painting Name Board Ladder-General Civil Work
Strengthening by Structural Steel and Exteranl painting to Back side Varandha Gplus2 Lockup Building at Satrasta, Mumbai
Strengthening by Structural Steel and Exteranl painting to Back side Varandha Gplus2 Lockup Building at Satrasta, Mumbai
Strengthening by Structural Steel and Exteranl painting to Back side Varandha Gplus2 Lockup Building at Satrasta, Mumbai
Strengthening by Structural Steel and Exteranl painting to Back side Varandha Gplus2 Lockup Building at Satrasta, Mumbai
REPAIR / PAINTING OF STEEL FURNITURE AND REPAIR/POLISHING OF WOODEN FURNITURE AT BSO AVADI UNDER GE AVADI
PAINTINGS OF CHAIR VERANDAH M&L after removing of existing old worn out paint by any means with proper treatment from chair verandah and applying spray painting two coats with synthetiic enamel white paint over a coat of red oxide primer complete all as dircted and shown on drawings.
PAINTING ON MAIN RUNWAY, PTT, MTT AND CERTAIN OTHER AIR CRAFT MOVEMENT AREAS AT AF STN KALAIKUNDA
M&L for Preparation of old painted surfaces (The surface shall be scrapped with steel wire brushes or steel scrapers. The surface shall then be broomed to remove all dust and dirt and shall be washed with clean water) to receive painting and applying one coat of water based road marking paint (boldly and solidly without showing signs of brush marks) as in Painting lines,dashes,arrows letters etc ., on roads , pavement and the like surfaces, exceeding 10 Cm width ,with white, black , Golden yellow and orange colour as reqired at site complete all as specified and as directed. (a) Runway Centre line : 1150 Sqm x 6 times (once in one and half month) = 6900 Sq.m (Approx) (b) Runway Threshold and designation: 1300 Sqm x 3 times ( once in 3 month) =3900 Sq.m (Approx) (c) Runway Touch down zone: 1500 Sqm x 2 times ( once in 4 month) = 3000 Sq.m (Approx) (d) Runway Aiming point 1550 Sqm x 1 times ( Once in 6 month) = 1550 Sq.m (Approx) (e) Runway Side strip marking: 5000 Sqm x 1 times (Once in 6 month) = 5000 Sq.m (Approx) (f) PTT center line marking: 850 Sqm x 2 times (Once in 4 month) = 1700 Sq.m (Approx) (g) Bay markings (X,Y,VIP, ATC & PG ) : 2600Sqm x 4 times (Once in 2 month) = 32450 Sq.m (Approx) Total Painting Qty = 32450.00 Sqm (Approx)