Loading…
Loading…
15,827 results • Best match
RENOVATION OF THREE(3) NO.S BUSSTAND AT CHETLA CENTRAL ROAD(NEAR CHETLA PARK AND SRI SRI ACADEMY) AND JUDGES COURT ROAD(NEAR GOPALNAGAR ROAD) IN WARD-82
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
DEVELOPMENT THE PREMISES OF THE 3 X 72 INCH DIA SUCTION VALVE CHAMBERS AND ITS ADJACENT INSPECTION PITS ATTACHED WITH THE INTAKE STATION NO 3 AT IGWTP.
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
Construction of Farm Pond (30 no) in block khetri
for Painting work , QC Fee , Photos etc
DESILTING AND IMPROVEMENTS WORK IN SWD AT KATHIVAKKAM HIGH ROAD IN DIV-02, UNIT-01, ZONE-01.
PAINTING NEW IRON WORKS SUCHH AS STEEL DOORS ED BY THE EXECUTIVE ENGINEER BEFORE USE ON WORKS
Vadodara Yard :- Improvement to General, Admin, TRD Building, Hostel and ZETC Building with basic facility.
Applying design painting work upto 3 mm to 5 mm thick on wall surface in approved design, paint and shade etc. complete as per instruction of Engineer in charge of work Rate inclusive of all materials, labours , T &P , scaffolding, lead, lift etc. Complete as desired by Engineer in charge of work and (Nothing will be supplied by Railway Total 2368287.00
INTERNAL AND EXTERNAL SMART PERIODICAL SERVICES TO OTM AND MD ACCN AT SHILLONG UNDER GE SHILLONG
M&L for single component polymer modified repair mortar with compressive strength minimum 38 MPA at 28 days (ASTM C 109:99) and tensile strength minimum 2.5 Mpa (ASTM C 307) up to 15mm in a single coat @ 34 kg per sqm for 15mm thickness as per manufacturer's instructions complete all as specified and directed. Note: (a) The work pertaining to periodical services & Water Proofing shall be executed from authorized applicator through manufacturer of which the materials i.e paint, distemper, putty etc is proposed to be used by the contractor and approved by GE. (b) Cost of scafolding upto 10m hight of building is included in this item (c) The contractor shall upload along with the documents under cover-1. Memorandum of Understanding (MOU) with only one manufacturer mentioned in the contra the failing which the bid shall be liable to be rejected (d) 05 years guarantee of painting work will be admissible after date of completion and 15% amount will be reserve against painting work after date of completion for the 05 years.