Loading…
Loading…
15,835 results • Best match
DESILTING AND IMPROVEMENTS WORK IN SWD AT KATHIVAKKAM HIGH ROAD IN DIV-02, UNIT-01, ZONE-01.
PAINTING NEW IRON WORKS SUCHH AS STEEL DOORS ED BY THE EXECUTIVE ENGINEER BEFORE USE ON WORKS
Vadodara Yard :- Improvement to General, Admin, TRD Building, Hostel and ZETC Building with basic facility.
Applying design painting work upto 3 mm to 5 mm thick on wall surface in approved design, paint and shade etc. complete as per instruction of Engineer in charge of work Rate inclusive of all materials, labours , T &P , scaffolding, lead, lift etc. Complete as desired by Engineer in charge of work and (Nothing will be supplied by Railway Total 2368287.00
INTERNAL AND EXTERNAL SMART PERIODICAL SERVICES TO OTM AND MD ACCN AT SHILLONG UNDER GE SHILLONG
M&L for single component polymer modified repair mortar with compressive strength minimum 38 MPA at 28 days (ASTM C 109:99) and tensile strength minimum 2.5 Mpa (ASTM C 307) up to 15mm in a single coat @ 34 kg per sqm for 15mm thickness as per manufacturer's instructions complete all as specified and directed. Note: (a) The work pertaining to periodical services & Water Proofing shall be executed from authorized applicator through manufacturer of which the materials i.e paint, distemper, putty etc is proposed to be used by the contractor and approved by GE. (b) Cost of scafolding upto 10m hight of building is included in this item (c) The contractor shall upload along with the documents under cover-1. Memorandum of Understanding (MOU) with only one manufacturer mentioned in the contra the failing which the bid shall be liable to be rejected (d) 05 years guarantee of painting work will be admissible after date of completion and 15% amount will be reserve against painting work after date of completion for the 05 years.
1) Shegaon - Proposed extension of High Level platform No 3 (Up side) from 16 coaches to 24 coaches Shegaon railway station.(PID: 01.01.53.25.3.50.036). 2) Provision of Divyangjan Amenities at Achegaon, Bodwad, Varangaon & khamkhed in the ... colouring, painting etc.
Painting with synthetic enamel paint of
PERIODICAL SERVICES TO INTERNAL WALL SURFACES, INTERNAL WALL PLASTER OF MARRIED AREAS AT INS SHIVAJI LONAVLA
M&L for preparation of new plastered surfaces on ceiling and applying three coat of white wash etc complete all as specified and directed by Engineer-in-Charge Note for Sl item No 1 to 15 :- (i) Unit rate quoted shall include for necessary scaffolding, trestles, ladders & cradles required upto 10Mtr hight for execution of the work and protective works. (ii) Painting Work will be carried out through authorized applicator only. (iii) 50% materials will be deposited by contractor in MES store & same issue as work progress
SMART PERIODICAL SERVICES TO DOMESTIC AND TECHNICAL AREA AT AF STATION OJHAR UNDER GE(AF) OJHAR
Material and labour for water proofing treatment of external walls, chajjas and newly plaster surfaces by applying two coats of elastomeric coating material after clearing the surfaces thoroughly and sealing all cracks with acrylic sealing compound complete all as specified and as directed. MAKE :- Dr FIXIT / PIDILITE / FOSRAC /EXCOT NOTE FOR ALL PAINITNG AND WATER PROOFING ITEMS :- The following precautionary measures shall be ensured by the contractor before and during execution of the work :- (i) All the painting works and water proofing works shall be got executed through original material manufacturing company or their authorised applicators as approved by GE (ii) Contractor shall deposit entire quantity of materials (proprietory materials) in sealed containers required for painting works covered under subject contract in the custody of Engineer-In-Charge/ Office in charge of unit. (iii) The materials as required shall be issued to contractor by JE/ Engineer-In-Charge on daily basis and the empty containers/ bags shall be deposited in the store of Engineer -In-Charge by the contractor, for verification as per standard consumption/ coverage prescribed by the manufacturers. (iv) After completion of painting work contractor shall remove and clean all the droplets/stain of paint left on the floor, glasses and joinery.