Loading…
Loading…
15,022 results • Best match
Repair/ replacement of hangers and other connected B/R works in Tech Area at AF Stn Tezpur
Material and Labour for prepration of old decorated wall by washing, rubbing down and stopping of old distempered and painted surfaces and applying one coat of oil bound distemper on walls, complete all as specified and directed. Note: Painting work will be carried out at height 10-20 mtr from ground level.
DAY TO DAY MAINTENANCE TO THE BUILDINGS INSIDE NAVAL DOCKYARD UNDER AGE B/R-III, GE(NB) VISAKHAPATNAM
M&L for preparation of new platered surface of wall and applying two coats of weather proof 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre, dart pick up resistant,silicon enhanced,UV resistant and PU enhanced property over a coat of alkali resistant primer including applying two coats of wall care putty exterior grade to a smooth surface including making good any undulations on the surfaces including all necessary scaffolding,complete all as specified and directed. Note :- Painting work shall be carried out acoording to Smart Painting procedure mentioned in PS
PERIODICAL SERVICES AND OTHER MISC WORK TO MD ACCN IN ZONE C AREA AT NDA KHADAKWASLA
M & L for painting the new WALL surface complete all as specified and directed as follows :- (a) Surface Preparation- Preparation of newly plastered or previously untreated surfaces of walls (b) Putty application- Applying a thin layer of wall care putty to obtain smooth and even finish after rubbing with emery paper (c) Priming surface- Applying one coat of alkali resistant primer (d) Painting- Applying two coats of oil bound distemper. Note for Item No 5 to 10 & 12 to 26 (a.) The work pertaining to periodical services shall be executed from authorized applicator through manufacturer of which the materials .i.e. emulsion Paint, Distemper, Cement base paint, Putty etc. is proposed to be used by the contractor and approved by Garrison Engineer. (b) Rates quoted are deemed to be inclusive of scaffolding required and safety equipment reqired as per safety norms. (c) Stage for Preparation of surfaces shall be got approved from GE before applying the finishes. (d) Sanding of surface to be done by mechanical sander with 1500 - 2700 rpm, with internal dust extraction system for clean environment certified by paint manufacturer. (e) Items used for periodical works shall be premium quality.
Construction of Commercial Complex in Scheme No. 7, Sector 7, Shastri Nagar, Meerut.
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture
5th Dry Docking Repairs of TUG TARINI
Both anchor and chain have to be lowered, scrapped and grit blasted to SA 2.5. All the joining shackles (4 nos. each side) are to be opened and overhauled. The chain to be calibrated and to submit the report for survey by IRS surveyor. Both anchor and chains to be painted with 2 coats of epoxy paint by airless spray. After finishing the paint work, connect the joining shackle and mark with white/red paint and seizing wire. Hoist both anchors in position and secure properly . paint PPA supply.
Development of Selfie Point with Central Attraction (Lion, Lioness and Cub Sculpture on Rock) and Interactive Information Panel at Lion Safari, Vasona, Forest Department, Wildlife Division, Dadra and Nagar Haveli (2nd Call).
A male Lion and lioness with a cub on rock Life Size realistic 3D model seating on rock. Installation at site with necessary platform. A. Standing alone male a. Height: 40 inches at Shoulder b. Length: in proportion of shoulder height c. Tail – 32 inches B. Seating Lioness a. Height and length in proportion of seating position C. Rock (Size will be varied according to the position of lion model setup) D. Lion cub (Actual Size) • The life size 3D model of animal to be displayed here are made from fiberglass and composition of high performance of resin. • The process of model making would follows and needs to show the proof (photo-video) of the same. • Clay modeling of behavioral pose (from approved reference/concept) • Die making, Casting, and finishing. • Realistic Painting work • Please note previously used or pre-dyed cast models will not be accepted. Transportation and installation at site. • Masonry platform will be constructed to fix rock and lion model • Size of 8ft. Length and 4ft. Width while height will be 15 inches • Flex stone should be cladded to give rocky and natural look. Size : Life Size