Loading…
Loading…
15,204 results • Best match
Construction of lane from main road to Gh. Nabi Malla, Mushtaq Ahmad Doom and others at Chatbugh Budgam
Add Provision for CIBPhotographs and painting for design of SBM Logo as directed by Engineer incharge.
SPECIAL REPAIR TO FURNITURE AT BAAZ AUDITORIUM BLDG NO P-83 UNDER GE GWALIOR
Repair of Chair Cushion Push Back (Auditorium) : Special repair to auditorium chairs including removal of old seat cover & cushion, providing new high density foam cushion (40-50 mm thick), covering with approved quality fabric/rexine cloth not less than Rs 700 per RM and carrying out petty repairs such as tightening/replacement of nuts, bolts, screws, minor welding, lubrication, alignment correction and touch-up painting including handle complete all as specified and as directed by the concerned executive. Sample of material shall be approved by concerned executive before execution of work.
Replacement / Refurbishment of super structure above Lignite bunkers of Phase-I units and associated work in Lignite Handling System of GIPCL-SLPP year 2026-27
certification of scrapping & cleaning work from Engineer-in-charge, painting will not
EXTENSION OF PARK NEAR NARIHALLA DAM AND PROVIDING FACILITIES AND OTHER AMENITIES IN SANDUR TALUK
13 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Sqm 490.83 145.95 71636.6385
REPAIR/ MAINT OF EXTERNAL WATER SUPPLY NETWORK ALONGWITH SLUICE VALVES, GATE VALVES, NRV, VALVE CHAMBERS, PUMPING SET AND OTHER CONNECTED ITEMS AND REPAIR/ MAINT, SERVICING, TUNNING TO DG SETS OF VARIOUS RATINGS, LT PANELS, AMF PANELS,
M & L for painting to existing complete STP system, 2x250KLD capacity made out of MS/Steel structural sewage treatment plant with one coat of epoxy paint (weather proofing paint) after necessary cleaning, preparation of internal and external surfaces of complete sewage treatment plant by using spray gun machine complete in all as specified and directed. (Note : (i) Manpower for the painting work shall be arranged by the contractor, so that the job can be completed within 01 x working day to avoid any fuctional issue of STP. (ii) Contractor has to submit schedule of painting for both internal and external surfaces separately alongwith workmen and T & P details for smooth functioning STP. (iv) Contractor has to take written permission 03 days in advance before deputing T & P and labour to work site for painting internal wall surfaces of various tanks/componants of STP. In any case contractor brought workmen without permission of Engr-in-Charge, he will be fully responsible for labour loss/waste/under utilization and no additional payment will be made to this effect.)
Building works/ Building maintenance works with structural steel and Metal Sheet roofing items.
32 The quoted rate shall be inclusive of providing and erecting temporary barricading of height as per above 'Guidelines for Air Pollution mitigation' (but minimum 10 feet height) using structural steel (MS Pipes or angle iron frame work etc.), covered with tin / GI sheets of approved colour & shade, Struts, MS Clamps, Bracing etc. and shall have wicket gate & material gate and including writing and painting of direction & instructions, providing glow lamps, reflective signs, marking, flags, caution tape etc. Prior written approval of Engineer-in-Charge of the sketch/ drawing showing details of barricading shall be obtained by the contractor. The barricading shall be provided and retained in position at site continuously during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour, materials, equipments and works required to execute the job such as earth work, concrete, welding etc. After completion of work, Contractor shall remove and take away the barricading at his own cost with the prior approval of Engineer-In-Charge. The entire work shall be executed as per direction of Engineer-In-Charge. No work shall be allowed unless the barricading is completed to the satisfaction of the Engineer-in-Charge. The Contractor shall submit a certificate for completion of barricading along with 1st RA bill after certifying by Engineer-in-Charge for releasing the payment.