Loading…
Loading…
2,468 results • Best match
S&T work in connection with the interlocking of 4 nos. of LC gates in the section of SSE/Signal/BQA in Adra Division.
Preparation of Gate Working Rules (GWR) in English on the basis of station working 91 rule diagram and gate working rule diagram to be supplied by the contractor. Submission of two draft copy to railways for checking and resubmission of draft in three copies for approval of division after making corrections. Editable Soft copy to be supplied in pen drive.
Construction of foundations, substructure and superstructure of Road Over Bridge cum Limited Height Subway in lieu of LC No. 151-SPL on Ambala-Ludhiana section including miscellaneous and allied works.
200.00 from track, duly digging / scarifying ballast by beaters / wire brushes or any mechanical means, leveling and dressing formation with specified cross slope after salvaging ballast, separating muck by screening the salvaged ballast with contractor's 20mm size sieve, stacking of screened ballast for measurement, disposing off muck at specified locations with all lead & lifts as directed by Engineer in-charge. Note: Payment shall be made for quantity of ballast stacked after screening of retrieved ballast from track. Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS-GE-1) with latest correction slips at Railway depot or nominated location. Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance between nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully.
MERGED ORTHO ITEMS
Approved Sources Description :TENNIS ELBOW SUPPORT ASSORTED SIZES (SMALL, MEDIUM, LARGE,XL SIZE) ] CENTRAL HOSPITAL HUBBALLI, Karnataka 150.00 Numbers SWR RAILWAY HOSPITAL BENGALURU, 100.00 Numbers Consignee SWR RAILWAY HOSPITAL MYSURU, 15.00 Numbers SWR
CPOH/Kacnchrapra- Creation/augmentation of intermediate/periodic overhauling facilities for track machines.
Under Conditions Traffic Block: 25mm gap 'in-situ' welding during traffic block using Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding portion and related accessories as per Annexure - I shall be supplied by Railways. All other items required shall be supplied by the Contractor. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 4. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer- in-Charge after release from track.
Monigram - Provision of 2nd detection at MANIGRAM (MGLE) for reliability improvement
Design of circuits in connection with preparation of Station wiring diagrams as per approved Signalling Plan and submission of indoor as well as outdoor completion documents. It includes Route Section Plan (RSP), Selection Table (ST), Locking Table (LT) and Control Panel Diagram (CPD)/VDU Diagram. Two copies of prints with soft copy will be submitted to Railway for checking. If alterations are suggested/proposed by Railways then again two copies of prints will be submitted for advance approval after carrying out all the alterations as suggested/proposed by the Railways. Tracings will be submitted for all the diagrams mentioned above for the purpose of approval by Railway prior to commissioning of station. All drawings will be prepared in CAD. The wiring diagrams will consist relay rack analysis, relay contact analysis, fuse details. Tag block analysis etc. A separate CDlPen drive will be submitted to Railway for each station along with original tracings. It also includes preparation and supply of laminated one set of all completion plans including circuit diagrams and indoor as well as outdoor completion documents on standard 75- micron polyester film for station in Auto CAD. 6 (Six) sets xerox copies will be submitted for each of the documents mentioned below: Cable Route Plan, Cable Core Chart, Location details plan for all the locations, Cable termination details, Signalling Plan, SWR Diagram, Wiring Diagrams, Selection Table, Locking Table, Contact Analysis, Fuse and Tag Block Analysis of Relay Rack and CT Rack, Control Cum Indication Panel/VDU diagram, Power Panel Diagram, Track Circuit Plan, Rack Erection Plan and Junction Box details etc. Note: Total cost of design and completion documents for a station/yard will be calculated on basis of total possible movements/routes as per Selection Table (ST). Inspn:- Consignee. Total 58797.00
Phalodi Jn. - Jaisalmer CTR(P) - 48.905 Tkm (From Km 134.29 to Km 160.595 & Km 183.4 to Km 206) by Contractors own PQRS/SQRS portal with Supply of P.way material under ADEN/JSM Jurisdiction.
24600.00 screening of ballast in Points and crossings with all contractor's labour, tools and plants as required to carry out the work to the standards in specific time including crossing of tracks etc. complete and as directed by the Engineer - in - charge. I. Pre-BCM Operation : a) making trenches for insertion of cutter bars at various locations as per the directions of engineer in charge. i.e.., one trench ahead of one rail length from SRJ and second trench near sleeper No 62 ( 1in 12) etc., b) Filling up ballast up to sleeper level. c) Tightening of fittings/ plate screws, ERCs, Stud bolts, check rail bolts. II. During BCM Operation : a) Assistance to S&T Department : Opening of cables at approach of Points & Crossings, TLD Boxes/ removing of Point motor and refixing the same and covering cables after passing of BCM in block period with S&T Staff. b) Engineering : c) Removing of two long sleepers i.e.., sleeper No 3 & 4 and refixing the same in position during block after passage of BCM. d) Removing obstruction i.e.., S&T CC block duly digging with crow bars and breaking with chisel/ hammer, cutting of rail pegs with gas. e) To remove, excess ballast on rail table for free movement of BCM and for packing purpose. f) Extension of cutter bar wherever required in assisting machine staff. g) Removing of cutter bar/ Chain links from the trenches after screening work by BCM. III . Post BCM Operation : a) Packing switch portion including Motor long sleeper i.e.., SRJ to heel joint to reset Point for train movement & initial packing of lead portion to allow train at 20KMPH and lifting the track in two stages (50mm to 75mm in each lift) wherever required for correcting the longitudinal surfacing b) Dumping of ballast in the deficient portion in crib, on main line turnout side for initial packing purpose. c) Boxing / Levelling of muck duly ensuring levelling of muck on cess side and lowering of cess to the deep screened depth and removing of muck in between the lines and leading up to 250mts. Note: 1. For technical reasons, some of the points and crossings cannot be deep screened either fully or partially by BCM, in which case, the left over length will be deep screening manually. 2. The length of points and crossings assembly for payment of this item should be taken from SRJ to longest concrete sleeper available just beyond heel of crossing along main line. JODHPUR DIVISION-ENGINEERING/NORTH WESTERN RLY Carrying out pre-tamping, during tamping and post-tamping work for tamping track with all types of rails, sleepers & sleeper density by various Track Tamping machines, like CSM,DUO/3X Machines which include : (1) Re-adjustment of ballast, heaping-up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effective packing; (2) Clearing of ballast on sleepers to make them visible to operator, (3) Clearing of ballast over rail foot to facilitate holding of rail by rollers of TTRM; (4) Digging, screening and replenishment of ballast at mud pumping / rounded ballast in sleeper crib location; (5) Tightening of loose fittings immediately before & after tamping; (6) Replacement of broken / missing fittings supplied by Railway; (7) Correcting displaced sleepers to position along with squaring; (8) Re-setting of worked-out / fallen fittings. (9) Removing and re-fixing joggled fish plates & wooden blocks, wherever necessary; (10) Manual consolidation of ballast in crib / shoulders; (11) Removing and refixing of traction bonds during the block in electrified sections (12) Dressing of ballast Note: 1. Tamping blocks are not identical & it may be given at any time either during day or night. 2. Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping. 3. Recovery at the rate of twice the above applicable rate will be effected in case contractor fails to carry out pre/during/post operation. 4.Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile.