Loading…
Loading…
2,468 results • Best match
P.way maintenance work under the section of SSE/P.Way/BDC in between
255.00 from Railway's wagons other than Hopper wagons by opening the doors of boxes and pulling & pushing down sand with rake irons / phowrahs taking out jammed sand and distributing unloaded sand uniformly over the track. Total 1028760.80 Item- 5 Please see in the item Break-up S No. Item Description of Item Unit Qty Rate Amount No 25mm gap 'in-situ' welding during traffic block using Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding portion and related accessories as per Annexure - I shall be supplied by Railways. All other items required shall be supplied by the Contractor. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 4. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track.
Electrical work for Improvement of electrical safety by replacement of overaged Transformers of different capacity over SER for Adra Division.
Installation, testing & commissioning of Railway Numbers Supplied 160 KVA Distribution Transformer outdoor type, 11/0.416KV, 3 phase , 50Hz,Oil Cooled, Copper wound distribution transformer complete with all accessories as per IS-1180,Pt -1, 2014 or latest (if any) & CEE/GRC's Spcn.No.CEE/Transformer/11-2010 (Rev.) and damage clause as per CEE/GRC Circular no. PS/2012/3 with first filling oil and off load changer and all other necessary fittings etc to complete the work in all respect.Item cost includes cost of all necessary accessories to complete the work in all respect including augmentation work (if required) as advised by competent railway authority keeping site requirement in view. Erection cost includes transportion of the supplied transformer from the main store depot to the site, dismantling of the old transformer with other necessary works(if any) relating to the existing system and erection, testing and commissioning of the new one with augmentation work with all necessary accessories to complete the work in all respect to get reliability of electrical installation as advised by railway site incharge.
"Provision of Indoor and Outdoor signalling work in connection with IBS at 03 Locations between NBP-JNH, JNH-SQN & JNH-BYHA section, addition & alteration in existing Electronic Interlocking system at Janghai, Nibhapur and Baryaram stations and ... signalling works at ...
Elevation & distance of foundation from track shall be in accordance with schedule of dimension for Indian Railways and as per NR practice. All items for the above works except Signal unit, LED signal, Signal post, Base and Ladder shall be supplied by the contractor including but not limited to the following: i) "U" bolt for offset brackets, ii) Wooden cross arm 1 meter x 1 meter, iii) MS angle and MS sheet for blanking of ladder, iv) Supply and fixing of signal number plate (Retro reflective) with complete fittings as per standard railway practice. v) Wire mesh guard, lock for unit if required, nuts, bolts etc., for the following: (a) Installation, erection, wiring of 2 aspect color light signals.
ARC FOR HT LT TC ERECTION AND MAINTENANCE WORKS FOR VEMALI SUB DIVISION OR ANY OTHER SUB DIVISION UNDER VISHWAMITRI WEST DIVISION.
worked under Railway Department, agencies who have worked under option-2 for
ARC FOR LAYING OF U/G CABLE (schemes & maintenance) WORKS FOR VEMALI SUB DIVISION OR ANY OTHER SUB DIVISION UNDER VISHWAMITRI WEST DIVISION.
worked under Railway Department, agencies who have worked under option-2 for
Setting up of Media Addressing Room/Studio in improved service building Zonal HQ/BBS.
Supply. Installation, Testing & commissioning of Structured Wood materials : 3 Materials : Kapoor Wood. Hardwood 9Origin ; Malaysia, Indonesia and South east Asia 0. Dimensions ; Kapur wood (2"x2" wall structure).Usage : Frame work for partition walls, ceiling support and door fittings. a.Ply wood b. 6mm waterproof :8ftx4ft c. 12mm waterproof :8ftx4ft Complete as per manufacturers specification and direction of Engineer in incharge.Inspection by Representative of Railway. Square