2,468 results • Best match
Preparation of land acquisition plans and proposals, obtaining forest clearances and other land acquisition related works in SRMT GGC New line, MTJ DHO 4th line and DER DAQ 4th line in jurisdiction of Dy. CE/C-2/Agra and Dy.CE/C/CNB.
Providing and fixing cast in situ or precast M- Each 25 concrete pillars along the Railway alignment terms of reference & relevant provisions of Indian Railway alognment terms of reference & relevant provisions of Indian Railways code for Engineering Department (199, Third Reprint) with up to date correction slips and as directed by the Engineer in charge on straight and curves as per Scope of work & Technical Specifications with Contractors own materials, tools and plants, including all leads and lifts, transportation, making own service roads for leading of stones & materials and crossing of track etc. including all taxes and ro yalties complete: including painting marking the pillars at site. The rate includes the cost of all material including centering shuttering, cutting binding, reinforcement and erection of stones etc. Location of concrete pillars 1) At every 500 mtrs (as per direction of engineer incharge) along the Centre line of the appro ved Railw a y alignment using 1200x100x100mm concrete pillar with 700mm projection abo v e the ground level duly embedding in CC (1:4:8) of 300x300x500mm siz e base concrete, including setting out prposed curves at site indicating tangent points, apex point and crown of curv e and approach of Major Bridtge. 4). The Chainage or KM & distance of proposed centre line of track shall be marked on these pillars 5) Seprate colouring preferable yellow colour for centre line alignment pillars are to be painted for identification 6) Centre opoint direction has to be painted on alignemnt pillar with chainage are to be painted. 7)NCR has to be engr a ved on all pillars and painted with black pain DYCE-C-I-AGC-ENGINEERING/NORTH CENTRAL RLY
BALANCE ELECTRICAL WORKS OF AUTOMATIC COACH WASHING PLANT AT COACHING DEPOT SAMBALPUR.
Laying of HT/LT single cable across the road/Track as per Railway appd drawing.
Modification of 33 KV overhead power line crossing at 4 locations through underground in Lalpur - Gop Jam section
Supply and laying of 160 mm outer dia HDPE Metre pipe as per IS:4984-1995 of different sizes under the Railway track/road etc. after digging of trench and back filling with excavated earth after laying of pipe and making good the damages as required as directed by Section Engineer-in-charge at site Total 4734576.00 Item- 22 Supply of HDPE Pipe 400 mm S No. Item Description of Item Unit Qty Rate Amount No
Part(A):Banapura Balance Works of Station Building, Raising & Extension of PF No.2 & 3 BAY COP Work, parking area construction of boundary wall. Part(B):Bhopal Division: Provision of FOB at 5 Nos NSG 6 stations (PAL, CRK, PGL, DKI & DRA) in ET-KNW section. Part(C):BPL Div- Improvement of divyangjan facilities at SHRN, HD, NSZ, ET NDPM, SCI, BHS, BAQ, BINA, GUNA & SVPI stations
and as per railways scope of work.(Note: Cable will be supplied by Railway at concerned depot.)
S&T work in connection with provision of Additional Loop Line at Dumrikhurd station(PI station) of Nagpur division of SECR.
Note: - This item will be issued to contractor from Railway store only for picking of existing track circuits during Pre-Pre-NI & Pre-NI work. B33 1000.00 Metre 66.00 66000.00 AT Par 66000.00 Description:- Supply of PVC insulated GI flexible wire for lead wire of track circuit used in Railway signalling. Dia 6mm (19 Sqmm cross sectional area) Constrction 7x7 core WSC. Lay Right Hand
S&T works in connection with Extension of COP to Cover Entire Length of Platforms at Adilabad, Kinwat, Himaytanagar, Bhokar, Manwat Road, Selu, Partur, Rotegaon and Washim Stations over Nanded Division
Excavation of pit in and around the existing location boxes very carefully without damaging the working cables and shifting and turning the location boxes to clear of the infringement as instructed by the Railway representative at site. The work includes, ensuring the safety of the 14 signalling system, releasing the cable coils to give access for shifting/turning the location boxes. Necessary masonry work and earth work in and around the location boxes to the required level shall be done as instructed by the Railway representative at site. If the existing earth connections to the location boxes are disturbed, the earth wires shall be properly reconnected. [All materials required for the work shall be supplied by the Contractor]. Shifting of apparatus case (Full)