Loading…
Loading…
2,325 results • Best match
Carrying out Zone works for period ending 30.06.2027 on Zone No. 3 LC.No. 244B to BPR (Both ex.) Loco Colony, station colony, S.E./works/ P. way,Sig, ADEN /L.office/ IZN, SMG Line, stn. colony, CBJ Line plant & colony / IZN.
Brick work with Railway bricks in foundation and cum up to plinth with 1:6 cement mortar (1 cement: 6 Coarse sand).
Vadodara Division: Electrical works in connection with improvement to allied facilities of various existing Track Machine Sidings over BRC Division.
Supply and laying of HDPE pipe, 110 mm diameter by pushing method under track/road - The price shall cover for supply of HDPE (High Density Polyethylene) pipe of 110 mm nominal diameter as per IS 4984-1995 of make Tijaria/Himalyan/Koncept/Poddar/Unique with accessories required 11 for laying such as coupler, bend etc. as per description given in Annexure-XXI of tender document. The price shall also cover for laying the HDPE pipes in the ground below the tracks/road by push through method at a depth below the formation level as indicated in the drawing supplied by railway. The term "formation" level means the earth surface just below the bedding of the ballast. In case of any hard/stony soil, contractor should adopt new technology method in push through method. Each length of the pipes shall be joined together properly using proper size of socket and aligned in a straight line, keeping an inclination to facilitate the draining of water.
Alteration Work for Interlocking of 01 No. Non Interlocked Engineering L.C.Gate at Rourkela-Kuarmunda Section.
Modification/Alteration in existing EI (Electronic Per Interlocking) as per latest RDSO guidelines & Alteration TAN. It includes: Design and modification in existing Interface, Interlocking circuits and logic of EI system including modification in the VDU (Video Display Unit)/ LCP (Local Control panel), CCIP (Control cum Indication Panel) if any, Maintenance terminal (MTPC), Data Logger, Relay rack wiring etc. The complete work should comply with the latest RDSO specifications, guidelines and as per approved SIP & circuit diagrams. All the material (Interface cards/ relays/ wiring material/ connectors/ fuses /communication devices etc.) shall be provided by the contractor. The work includes the supply of modified Selection table, Interface Circuits, VDU/LCP, CCIP diagram if any etc. to suit the modified SIP. It also includes the carrying out of FAT, SAT or two rounds FAT (as applicable) jointly with Railways and satisfactory commissioning. All plans/drawings/circuits etc. should be prepared on Auto CAD. Soft copy including Auto CAD copy has to be supplied in pen drive and 06 sets of hard copies also to be supplied as a completion drawing. (i) Alteration involving modification from 11 to upto 20 routes. Total 2564630.00
Alteration Work for Interlocking of 01 Nos. Non Interlocked Engineering L.C.Gate at Link-C - Dumetra Section.
Modification/Alteration in existing EI (Electronic Per Interlocking) as per latest RDSO guidelines & Alteration TAN. It includes: Design and modification in existing Interface, Interlocking circuits and logic of EI system including modification in the VDU (Video Display Unit)/ LCP (Local Control panel), CCIP (Control cum Indication Panel) if any, Maintenance terminal (MTPC), Data Logger, Relay rack wiring etc. The complete work should comply with the latest RDSO specifications, guidelines and as per approved SIP & circuit diagrams. All the material (Interface cards/ relays/ wiring material/ connectors/ fuses /communication devices etc.) shall be provided by the contractor. The work includes the supply of modified Selection table, Interface Circuits, VDU/LCP, CCIP diagram if any etc. to suit the modified SIP. It also includes the carrying out of FAT, SAT or two rounds FAT (as applicable) jointly with Railways and satisfactory commissioning. All plans/drawings/circuits etc. should be prepared on Auto CAD. Soft copy including Auto CAD copy has to be supplied in pen drive and 06 sets of hard copies also to be supplied as a completion drawing. (i) Alteration involving modification from 11 to upto 20 routes. Total 5129260.00
Supply, installation, testing and commissioning of Telecom material in connection with Provision of CCTV cameras at Manned Non-Interlocked Gates. (41 LC Gates)
Excavation of cable trench as per cable cum route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr wide advised by Engineer-in-charge alongside the track in normal (all type) soil/strata, conforming to distances as per cable route plan and refilling. This work includes clearing of route from bushes etc., covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on Western Railway and instructions of Railway Engineer at site. In case 1m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1m
A)TWR work in KWV-SEI block section from Km 384.0 to Km 390.6 under ADEN/LUR sub-division in SUR division B) TWR work in KWV-SEI block section from Km 393.0 to Km 399.6 under ADEN/LUR sub-division in SUR division.(Re-invitation)
TRM Fixing Joggled Fish Plates with bolt / clamp (supplied by Railway from nearest SSE Store) in running track conditions at welds on rail, as directed by engineer in-charge (drilling of holes in rail, if required, shall be paid separately).