Loading…
Loading…
2,325 results • Best match
TRD modification work in c/w Construction of ROB & RUBs in Bathinda-Suratgarh- Bikaner & Bikaner Ratangarh sections and Provision of RCC Box in lieu of various pipe crossings and Strengthening of super structure of bridges over Bikaner Division.
Provision of false catenary under bridge (Contact wire will be supplied by Railway) (Rates are inclusive of work under traffic/ power block).
Pre and post BCM work and other associated P.Way works in the section of ADEN/FZD.
100000.00 screened muck discharged by BCM where cess is low or cutting cess to required depth up to 4m from centre of track, where cess is high and disposing off extra muck beyond 5m from edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms, so as to make cess as per standard profile including providing proper slope. Carrying out pre-tamping, during tamping and post-tamping work for tamping track with all types of rails, sleepers & sleeper density by various Track Tamping machines, like CSM,DUO/3X Machines which include : (1) Re- adjustment of ballast, heaping-up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effective packing; (2) Clearing of ballast on sleepers to make them visible to operator, (3) Clearing of ballast over rail foot to facilitate holding of rail by rollers of TTRM; (4) Digging, screening and replenishment of ballast at mud pumping / rounded ballast in sleeper crib location; (5) Tightening of loose fittings immediately before & after tamping; (6) Replacement of broken / missing fittings supplied by Railway; (7) Correcting displaced sleepers to position along with squaring; (8) Re-setting of worked-out / fallen fittings. (9) Removing and re-fixing joggled fish plates & wooden blocks, wherever necessary; (10) Manual consolidation of ballast in crib / shoulders; (11) Removing and refixing of traction bonds during the block in electrified sections (12) Dressing of ballast Note: 1. Tamping blocks are not identical & it may be given at any time either during day or night. 2. Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping. 3. Recovery at the rate of twice the above applicable rate will be effected in case contractor fails to carry out pre/during/post operation. 4.Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile.
S&T arrangements in connection with Provision of (1) 03 lifts for 12m FoB at ATP station. (2)03 lifts for old FoB at AD station.(3)3 lifts for New 12m FoB and 3 lifts for existing FOB at DHNE station.(4)two lifts for New 12m FoB at MALM station. ... Ancillary work to ...
Blowing of armoured optic fibre cable (OFC Cable supplied by Railways) into the duct supplied vide other NS item of supply portion by using blowing machine and associated works. 10% 38 of OFC length to be blown extra on both ends of Duct i.e. total 20% of Duct length. Before blowing the duct integrity shall be tested. If any defect is found during duct integrity test, the entire length of HDPE duct from one chamber to another chamber is to be replaced by the contractor at his own cost. Payment will be made as per the length of Duct from which OFC is Blown.
Electrical Work in c/w Augmentation of running Rooms at MCTM & SVDK by providing 10 Nos. additional rooms
JAMMU DIVISION-ELECTRICAL/NORTHERN RLY Description:- Transportation, Laying, underground/road/Railway track, recessing in platform /wall 32 along with Rly. Track/in laid RCC/GI pipe as required 1.1 KV grade LT XLPE insulated armoured, aluminium conductor cable including making chase & plastering after laying of cable/digging of cable trench, sand cushioning, protective covering with second class bricks, provision of cable route marker as per Tech. Specification including end terminations with Aluminium Clamping socket/lugs, testing and commissioning of Above 25 sq.mm
(1) Bhestan - Extension of NIYOL- BHET By pass line to UP Loop with provision of extension of DN Loop upto S-5 UDN. (2) Track work in connection with Surat:- Construction of New TRIP shed.
1 in 12 Turnouts Assembling on temporary staging and insertion of all types of turnouts including diamond crossings and derailing switches on prepared ballast bed during traffic block, manually or by contractor's cranes, at specified location with 52Kg / 60Kg rail section on PSC sleepers with Railways rails/sleepers available anywhere within 500m as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings etc. including rail cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including crossing of track, filling and spreading of ballast in crib and shoulder as required, linking of turnout with existing track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete in all respect and as directed by Engineer in-charge. Note: Required P.Way fittings shall be supplied at the SSE/P.Way stores.
Provision for extension, raising, resurfacing of Platform & other amenities at Ranital, Nilgiri Road, Khantapara & Bahanagabazar station under the jurisdiction of ADEN/BLS. (2nd Call)
Unloading of sand / quarry dust during block cum from Railway's wagons other than Hopper wagons by opening the doors of boxes and pulling & pushing down sand with rake irons / phowrahs taking out jammed sand and distributing unloaded sand uniformly over the track. Total 1581456.00