Loading…
Loading…
2,282 results • Best match
Hiring of manpower, DG set and LED light fittings in SE and NE ghat section for a period of four months during the monsoon period.
Excavation of cable trench in soil & filling the Metre trench with sand, pebbles etc. after laying of the cable complete with RCC warning cover & cable markers, sand etc. as per railways requirement Total 57559.80 Item- 13 Supply and laying of RCC warning cover as per approved drawing. S No. Item Description of Item Unit Qty Rate Amount No
Construction of Zero track along with augmentation of track machine siding at KKDE under ADEN/KUN.
Extra for every Km per MT beyond 150 Km over MT-Km item no. 172057 Total 128742.10 All items under chapter No.21 i.e. "Miscellaneous Items" of NR/DLI USSOR-2021 edition (Corrected upto date) complete for all L&M as per Indian Railways Unified standard Specifications (Formation Item- 5 Works, Bridge Works and P. Way Works) 2021 edition (Corrected upto date).of USSOR-2021 (Corrected up to date) S No. Item No Description of Item Unit Qty Rate Amount Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
HYB Division: ADEN/MED - Annual repairs/maintenance of quarters and service buildings including stations, circulating areas, yards, foot over bridges, gardens/parks under the jurisdiction of ADEN/MED for a period 01.07.2026 to 30.06.2027
15000.00 sources outside the railway boundary with 1000 contractors own vehicles (water tankers / Litre bullock carts or any other transport arrangement ) including filling of water and delivering at nominated locations (including pumping if required in the railway colony/station or any other locations in the railway premises with all contractors materials, labour, tools, materials, lead, lift, consumables etc. complete and as directed by the Engineer-In-charge at site. HYDERABAD DIVISION-ENGINEERING/SOUTH CENTRAL RLY
Comprehensive Maintenance Contract for POH activities of RMPU with control panels fitted in AC coaches(LHB type ) for 527 coaches (i.e. 1054 RMPU unit)at CRWS Bhopal for 24 months
Replacement of Microprocessor Controller Numbers 100.00 (Microprocessor will be supplied by Railway)
TRD Work in connection with BLAX Yard Remodeling with additional loop line under Simhastha 2028
Provision of False Catenary under Bridge (Contact Wire supplied by Railway)
Earthwork, blanketing in formation, extension of minor bridges, L-xings, construction of station buildings & platforms, major bridges and other ancillary works at Kunda Harnamganj, Arkha and Unchahar Yard in connection with doubling of Phaphamau-Unchahar Section (72.27 km) of Lucknow Division
Mechanical blanketing material by using only hard and durable stone crushed in mechanical crusher to different gradations, wet mixing of the same in designed proportion in Pug mill or wet mix plant to have uniform gradation including all incidental transportation, laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density and finishing to correct profile, complete as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest correction slips. Note: This item shall be used only when entire constituent of blanketing material is mechanically manufactured by crushing of hard and durable stone into desired gradation of designed proportion. Total 162367800.00 Item- 3 All items of chapter-1 "Earth work " of USOR -2021 except item No-1 & 2 S No. Item No Description of Item Unit Qty Rate Amount DYCE-C-V-LKO-ENGINEERING/NORTHERN RLY Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer- in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract.