Loading…
Loading…
2,282 results • Best match
Construction of New FOB at ANARA Station from UP Side to connect at platform in Adra Division.
Launching & placing of Girder of the Foot Over Each Bridge in required location using Road crane Span including contractor's all labours, materials, all consumeable fuel etc, tools and plants lead, lift, GST and all taxes etc complete as per instruction of Engineer-incharge. "Note : (1) The work includes Fixing of slings, cost of slings, lifting of FOB. ( 2) The work includes all pre work such as placement of girder at an appropriate location on platform as required, fixing of slings as per requirement and placement on the column and fixing of bolts after placement of girder over the column The work includes cost of man power, operations machines, gas cutting equipments and is inclusive of execution of work under traffic com power block. (3) The work is inclusive of all lead, lifts, track crossing and all other hidden operation during placement of the FOB girder between Platform and required location. (4) The work is inclusive of all taxes, octroi, road tax for cranes, vehicle etc. (5) The work may be done during day or night hours as per the timing of traffic cum power block granted by Railway. In case of of night working, light arrangements will be provided by the agency at his own cost. (6) In case of Non availability / ncancellation of traffic cum power block, No contractor's claim will be accepted. (7) Crane will be applicable only for launching of Girder only. (8) No other charges will be paid for launching of Girders of FOB." Total 36350668.53
Telecom Facilities for new class room ,model room ,principal office mess at MDDTI of Kota Division WCR
"Supply, installation, testing, and commssioning Numbers of 55"" LED smart 4K screen display monitor (TV) of Sony/ Panasonic / LG / Samsung or equivalent reputed make. (Model to be approved by railways before supply)With supply of suitable stand "
Churchgate - Electrical (Power) work in connection with repairs & prevention of leakage in control tower.
Fixing & commissioning of ceiling fan on existing M.S. hook: 1. The fan shall be installed complete with accessories & safety device e.g down rod, blades, canopies, rubber insulator, split pin & nut bolt with spring washers. If required size and length of down rod is different than 14 original OEM make, then down rod will be supplied by the Railway. 2. The fan shall be connected with the supply point (within 3 mtr distance) using PVC insulated & sheathed copper wire 03 core 1.5mm2 size, LSHF / ZHFR, conforming to IS 694/2010 or latest and ISI marked, in PVC pipe or as per site conditions, with proper workmanship. (The ceiling fans will be supplied by Railways, transportation to site will be done by the firm from Mumbai central).
Construction of Community Well at Marghmal Ta- Dharampur, Dist-valsad (Third Trial)
of work with railway freight loading, unloading
SW I.CTF: Raising of PF 1 & PF 2 from Rail level to High level, Provision of COP and passenger amenities at Chitgidda station under ADEN/VKB sub-division. SW II.CTF: Rehabilitation of Station Building at Chitgidda (CTF) Station in Sr.DEN/West jurisdiction.
Providing and Fixing of Stainless steel (SS Kg 304 grade) water valley gutter made of SS plate of 1.45 mm (tolerance +/- 0.045)thickness including welding, grinding, buffing, polishing and making required shape etc., and fitting to the existing steel structure with necessary stainless steel nuts & bolts, cutting holes , making connections for all heights with contractor's men, tmaterial, labour, tools, plants, transporting to site, with inclusive of taxes, crossing of track wherever necessary etc., specifications confirming to Railway standards complete as directed by Engineer-In - Charge at site. ( for payment purpose only weight of stainless steel members shall be considered excluding fixing accesoriessuch as nuts & bolts, fasteners etc.,) SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
S&T portion of work in connection to (1) Replacement of Integrated passenger information system (IPIS) at HIJ (PF No-1 &2) & KGP ( PF No- 7 & 8). (2) Comprehensive Annual Maintenance Contract (CAMC) of Double faced CGDB, Single line double faced Platform display board, Single faced Monocolor (MLDB) Three Line Train Arrival/Departure display board, Platform Data Controller (PDC) & Central Data Controller Unit (CDC) at HIJ (PF No-1 &2) & KGP (PF No- 7 & 8) in KGP Division of S.E.Railway.
3.00 34734.00 of Optical Fibre Cable along with HDPE pipe from the stores of SSE/Store or from any store of SE Railway to the site with care laying of HDPE pipe & blowing of OFC in it as per procedure and returning empty cable drums with or without left over cable to the stores of SSE/Store. It also includes supply and placing of warning & Detection tape orange colour of 100 mm wide printed in black as "CAUTION OFC CABLE" and laid throughout the trench as directed by the Representative of Railway. Note: OTDR of cables will be done before & after its laying by contractor under supervision of Railway representative & contractor will submit their reports.