Loading…
Loading…
2,282 results • Best match
Provision of Power Supply Arrangements for Three Escalators at Coimbatore North Jn (CBF-NSG6) and three Escalators at Podanur Jn (PTJ-NSG4) - Electrical Arrangements.
Labour Charges for Laying of 50 mm Dia PE 63, PN 6 type HDPE pipe in the 7 excavated trench, on walls or on platform shelter etc., including suitable fixing arrangement complete in a manner as directed by Section Engineer-in-charge at site. (Note: Required HDPE Pipes will be supplied by Railways.)
Repairs to formation and construction of side drain at various locations in Peralam - Karaikal section.
of Railways escalation over CPWD-DSR 2023 basic value)
Balance work in connection with elimination of LC No 44 by construction of LHS on JHI-PNP section in the jurisdiction of ADEN/PNP
16.31 129732.28 and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per specification and as directed by Engineer-in-charge. Note: The payment shall be made on the theoretical weight of main components and gusset plates only. Total 2115933.49 All items under chapter No.5 i.e. "Bridge work Misc" of NR/DLI USSOR-2021 edition (Corrected upto date) complete for all L&M as per Indian Railways Unified standard Specifications (Formation Works, Item- 4 Bridge Works and P. Way Works) 2021edition (Corrected upto date).of USSOR-2021 (Corrected up to date) S No. Item Description of Item Unit Qty Rate Amount No
Replacement of Datacom Equipment's of PRS/UTS at Tier 2,3 & 4 and down locations over Hubballi Division
Laying / drawing of various type of cables on Metre PVC pipe / capping casing, or cable trays, ladder, shelter etc. as instructed by Railway engineer at site. (Indoor cables to be drawn through pipe, outdoor cables if required to be clamped on wall /floor etc. Total 36702522.00
Deepening & Cleaning of unlined side drain in cuttings under SSE/P.way/Udupi section, (E office Comp. No.72099)
Removing and rooting out shrubs, jungle, weeds etc., in Railway premises including 2 cess of embankment, cutting and disposing the debris away from the cuttings etc. as directed with all contractors men, tools etc., complete. (Weeds to be removed manually including roots. Just cutting on ground surface by deweeding machine without removing the roots will not be accepted ) Above/
Zonal Contract (2026-27) for Zone No. 4 under ADEN-Botad, Surendranagar gate (Incl) to Botad (Incl) -Rayka (Excl.)
Deputing staff for artisan staff for Masonary Work, Day Plumbing Work, Carpentary Work, welding, brazing of AL work for repairs of taps & flushtanks, pipe lines, replacement of broken window glass, repairs to doors window fittings etc. as per Railway Engineer instructions. Total 2693496.15