Loading…
Loading…
2,283 results • Best match
At RNY Division:- Electrical works in connection with sump and pumping arrangement along with drainage arrangement at 7 nos. LHS (RUB no. NN-171, NN-173, NN-184, NN-187, NN- 188, NN-192 & NN 194) in BG-ll section of Rangiya Division for avoiding water logging.
Excavation of cable trench 0.75 mtrs. below the GL with laying of armored cable and refilling the same by supply of 70mm sand and soil after digging the earth. The laying of armoured cable should be done as per direction of Engineer at site. (Cable will be supplied by Railway).
Electrical Miscellaneous Maintenance works under SSE/PS/PCOI (NYN to MNF and PCOI to IDGJ section) for 02 Years.
(cable will be supplied by Railway).
PRICE BREACKUP
Railway Hose Pipe 2 half feet x 1 half AS PER ATC
Replacement of Contractor Block LandT BCH Overload Relay SDz5 Timer at various Pumping Installation in Sector 10 Panchkula
20.10.3:- Extra for fixing sluice valves/flap valves socketed or flanged including cartage from stores or nearest Railway Station to site of works 3. 150 mm i/d [Through Rate]
Outsourcing of Track Maintenance Services of Operational assets of Ballastless Track of Mainline and 1 Nos. Depot of Navi Mumbai Metro Line-1 Project for a period of two Years.
Renewal of Baseplate with Baseplate Pads with all men and materials with lead and lift including local destressing and repositioning of track. As per IRPWM 2020 & Indian Railway, Navi Mumbai Metro Line 1 standards. (Baseplate shall be provided by MAHA-Metro at free of cost) [Refer scope of work]
Construction of Twelve units of type-II Qtrs, Thirty-Two units of type-III Qtrs, Fifty units of type-IV Qtrs and Ten units of type-V Qtrs (Total 104 units of Quarters) under the jurisdiction of Sr. DEN/Settlement/BSP.
asper railway approved GAD. The