2,280 results • Best match
Tender for work of Erection & Maintenance work of HT/LT line & TC and HT XLPE UG CABLE Work(Only Upto 300 MTR HT UG CABLE work) on ARC Basis for work under various scheme under KAMREJ RURAL S/dn under KADODARA Division.
5.16 While working within railway boundary any damage to the railway infrastructure, asset and
Tender for Attend the cable fault at site FROM RECIVING the message from CONCERN S/DN AND LOCATING THE FAULT UNDERGROUND CABLE and Rectify the fault (XLPE cable will be supplied byDGVCL) with cable end termination and straight through joints kits (to ... be supplied by ...
5.16 While working within railway boundary any damage to the railway infrastructure, asset and
Tender for work of supply, laying, testing and commissioning of 11/22 KV cable (OH+UG) (XLPE cable will be supplied by DGVCL) with cable end termination and straight through joints kits (to be supplied by contractor) as per norms under all scheme for the year 2026-2027 for Kadodara-1 Sub
5.16 While working within railway boundary any damage to the railway infrastructure, asset and
Tender for Work of Erection & Maintenance work of HT/LT line & TC and HT XLPE UG CABLE Work (Only Upto 300 MTR HT UG CABLE work) on ARC Basis for work under Various Schemes under KAMREJ RURAL S/dn under KADODARA Division.
5.16 While working within railway boundary any damage to the railway infrastructure, asset and
Repair and renovation at VHF Colony in the section of SSE/Works/South/KGP under jurisdiction of ADEN/Settlement/Kharagpur.
Cutting uprooting of trees or plants of any Each size from the wall or slab or chajja or parapet or roof etc of the multistoried building duly making hole into masonry and refilling the same with concrete or brick as per site condition sfter due application of hot copper sulphate of common salt to arrest further growth of the plants.Rate includes all labour,lead lift,taxes etc complete except cement which will be supplied free of cost by Railway as per Railway scale of consumption.Note:- If the plant comes up in the same location within 06 months,no payment will be made. Total 283900.00
Bina- Planning, Designing, Drawing & Construction of Ballastless Track(Up to 50 KMPH SPEED) at Bina Station LOOP Line Number 1 and 2
10700.00 by removal of ERCs and Metal / GFN liners in rail panel, cleaning of rust / scale of ERC, Metal / GFN liners & SGCI insert by using wire brush, scrapper / sand emery paper etc supply and application of graphite grease, as prescribed by Railway for under side of liners & corresponding area of rail foot & SGCI insert with ERCs and re-fixing the same as per procedure prescribed in latest edition of IRPWM with contractors grease and all other tools & plants complete and as directed. Note: Each ERC in this item shall constitute 1 ERC and its Liner Contact area. BHOPAL DIVISION-ENGG/WEST CENTRAL RLY