Loading…
Loading…
2,280 results • Best match
Zonal Contract (2026-27) for Zone No. 5-A under ADEN-Dhola, Vartej- Sanosara, Sihor-Palitana Colony & station Building.
Deputing staff for artisan staff for Masonary Day Work, Plumbing Work, Carpentary Work, welding, brazing of All work for repairs of taps & flushtanks, pipe lines, replacement of broken window glass, repairs to doors window fittings etc. as per Railway Engineer instructions.
Improvement of wharf of Good shed shunting neck by released PSC sleeper, renovation of toilets and bathroom of existing merchant and labour room and patch repair of damaged platform of goods shed at Tilda.
01 Description:- Supply and using cement at worksite : PPC S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Schedule () C-Execution of all works connected with above work covered under SEC Above/ Railway USSOR-2010 and Vol.I&II of IR unified standard specification (Works & 710579.20 Below/P materials) (For item No.045016 only). ar
Repair, Painting Of Permanent Structures Of Rain Shelter (Lulha Shivlok, Suiya, Chihutjor), Wayside Amenities (Jalebia & Suiya), Cafeteria (Chihutjor) For Shravani Mela -2026.
C Carriage for 175 km by railway = 185.10
Deep screening, Shallow screening, Sleeper replacement, Destressing of track ect under SSE/Ratnagiri section
132010 Systemic overhauling of track under traffic as per procedure prescribed in latest edition of IRPWM, including removing the crib ballast in 50mm to 75mm depth below bottom of sleeper and complete shoulder ballast without breaking core under the bottom of sleeper, to recover clean ballast by screening on wire mesh and disposing off the muck including throwing & 1 leveling, if required beyond minimum 5m from the edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms away from the track, as directed by Engineer incharge including cutting & making up the cess and ensuring proper drainage slope and then re-inserting cleaned ballast into track and compaction of shoulder and crib ballast by wooden mallet and dressing / profiling ballast as per railway specifications. 132011 For PSC sleeper Track with Sleeper Density of 1540 sleepers/Km or more
Guntakal Division- Replacement of OH Line with LTUG Cables Covering Service Buildings/Colonies in Guntakal Section for Improving the Power Supply Reliability.
satisfaction of Railways site Engineer and also as per R.B JPO no: No.2003/Tele/RCIL/I Pt.IX dated
Tender for Erection and maintenance of Overhead 11/22 KV HT line /LT line and transformer center at various areas all scheme under i.e. Rural, Urban, GIDC etc.) On ARC Basis under Bharuch Rural sub division of Bharuch city Division.
5.16 While working within railway boundary any damage to the railway infrastructure, asset and