Loading…
Loading…
2,284 results • Best match
Mumbai Central (Main)-(1) Provision of booking office at north FOB east side. (2) External and internal Painting of service and Residential building. (3) Repairs & Modification to Operating Infrastructure (SS/Dy. SS Office, Guard rest room & SWR Room.
"Fixing & commissioning of ceiling fan on existing M.S. hook: 1. The fan shall be installed complete with accessories & safety device e.g down rod, blades, canopies, rubber insulator, split pin & nut bolt with spring washers. If required size and length of down rod is different than 22 original OEM make, then down rod will be supplied by the Railway. 2. The fan shall be connected with the supply point (within 3 mtr distance) using PVC insulated & sheathed copper wire 03 core 1.5mm2 size, LSHF / ZHFR, conforming to IS 694/2010 or latest and ISI marked, in PVC pipe or as per site conditions, with proper workmanship. (The ceiling fans will be supplied by Railways, transportation to site will be done by the firm from Mumbai central)."
Provision of additional Quick Watering System for CAPE and ERS stations
Earth work in excavation as per approved drawings and dumping at embankment site or spoil heap, within railway land, including 50m lead and 1.5m lift, the lead to be measured from the centre of gravity of excavation to centre of gravity of spoil heap: the lift to be measured from natural ground level and paid for in layers of 1.5m each, including incidental work, as per specifications - All kinds of soils. Above/
SPECIAL REPAIRS TO OVER HEAD LT LINE TO UNDER GROUND LT CABLE AT ADM BLOCK CAD PULGAON AND PROVN OF 04 X LOW MAST LIGHT AROUND THE BASKETBALL COURT RA AT CAD PULGAON
Road cutting for laying UG cable under road /railway crossing, pavement, hardstanding by manually means, protection GI pipe for cable of required dia and making it good to match with the adjoining surfaces/structure for after cable passing complete all as specified and directed by EIC. Note :- GI Pipe and PCC will be measured and paid against respective item.
New Gujarat Pattern : 10 Taka State Level Fund : 2025 - 2026 Construction of Amadhara to Chadiya Road (Sadakpore Mandli) Km.0/0 to 1/1 Taluka : Chikhli. District : Navsari.
carrying indian railway standard with Hundred
ADDITIONAL WORK FOR WARUD VILLAGE (UNDER PIPRI AND 13 VILLAGES RRWSS) TO BE TAPPED FROM SEWAGRAM AND 5 VILLAGES RRWSS UNDER DISTRICT MINING FUND
Item No. 6 :- Manufacturing Providing and supplying spirally welded , ERW , SAW fabricated M.S. Pipe ( commercial quality ) including procurement of plates , gas cutting to required size , rolling tack welding asembling in suitable lengths to form pipes , welding on automatic welding machine and forming 'V' edges on both ends of pipes , poviding and applying epoxy paint of shalimar or ciba make as per specifications including all taxes (central and local) railway fright , insurance unloading from railway wagon , loading in to truck transportation to store / site / unloading stacking etc. complete. As per specifications.
Repairs to water supply Scheme At- Uddhar katkarwadi, in G.P-Uddhar
Item No. 3:-Providing & supplying ISI mark CI D/F reflux valve (Non- return valve) of following dia including all taxes (central and local) railway freight inspection. Reflux valve 65 mm dia