Loading…
Loading…
2,286 results • Best match
Reconductoring of 132kV Rangia-Nalbari S/C Transmission Line with HTLS conductor and associated works
Preliminary Survey including measurements of vertical clearance at maximum sag point, indentification and replacement including supply against damaged stubs, tower members and earthing and collection of all required documents required for obtaining statutory permission from Railways, Highway Authorities and other Government bodies.
At AIE, BEKI, MANAS bridge, EWS&Track Depot/BNGN - Replacement of fabricated tower by High mast.
Cutting of rail pole of 13 mtr long in to 1.6 mtr length, erection of rail pole 1.6 mtr long by contactor own arrangement by digging the pit to 1/5th of the pole height with execution of CC 11 foundation work of size 45cmx45cm in ratio 1:2:4 by cement, sand and chips of size 19 mm and down up to full depth & 1ft above the GL and 8 nos of rail pole (cutting) surrounding the high mast tower as per direction of EIC at site. Painting of rail pole by 2-coats of red oxide as primer and 2 coats of Aluminium paint as final coat as per direction of EIC at site. (Rail pole will be supplied by Railway)
Repair & Maintenance of Civil Engineering Assets for the year 2026-27 ending upto 30.06.2027 in Zone-1 under jurisdiction of SSE(W)/Col-I (Includes Sub Zone 1/A,1/B and 1/C) at CLW, Chittaranjan.
Fabricating strengthening, hoisting, fixing) & repairing of worn out steel structure of all section (including grill work) at any height at any location by providing additional M.S.Angle, M.S.Sheet, flat etc wherever if required to proper alignment as per instruction if site engineer with contractor's tools & plants. (Welding set, electrodes, electric energy), transport & labour etc complete in all respect. NOTE: Mild steel materials if required will be supplied by the Railway free of cost from SSE(W)'s store, if available. If it will be arranged by contractor's own arrangement where payment will be made separately.
Raising and extension of platform and other divyangjan amenities at japla station.
bolting, riveting or welding as per approved drawing or as directed by Engineer In-charge. Rate shall include cost of labour, materials, tools & plants and only pre-fabricated structural elements shall be given by Railway. (Work not requiring traffic or power block).
All in All Operation and Maintenance work of Sewage Pumping Station with Sewerage Network and Rising Main at Khajod and Tertiary Treated Water Pump House with Transmission Main at Bamroli for the period of 05 (Five) years for DREAM City Limited, Surat.(3rd attempt)
under the Railway /Highway /Road Track /Canal in all
Ahmedabad Division : Provision of 3 -meter wide FOB with lift well and lift at kadi station(Composite Tender).
Providing Fabricating & laying of colour coated Galvalume ( Proflex system roofing ) material for self supported roofing system ( Technology similar to Proflex system provided b y M&B engineering Pvt. Ltd., Ahmedabad), Material shall b e of following specification, B M T 0.90mm to 1.00mm, APT 0.95mm Tolerance + / - 0.02mm thick, width 605 m m o r a s dicided b y Railway 6 (Tolerance +/- 2mm), including supplying, loading, transporting, unlopading a n d staking a t site, fabricating and laying with all contractors tools plants, machineries, materials and fixtures labours including all lead and lift and laps/ wastage if any etc. complete. The colour of sheet will be decided by Railway. The rate is also inclusive of designing of roofing system, proof checking and providing execution drawing. Fabrication and installation of self supported roofing technology similar to Profles System provided by M&B engineering Pvt. Ltd., Ahmedabad decided by enineer. Above/