Loading…
Loading…
2,286 results • Best match
Design, Engineering, Supply, Erection, Commissioning and Testing of 2 nos 140 Ton Capacity pit less type In Motion Electronic Rail Weigh Bridge (IMEWB) in place of existing PIT type Rail weigh bridge as per latest guideline of RDSO at WTPS.
execution of complete work / supply shall be in bidder's scope The bidder has to visit the railway
Electrical arrangements for : a)Provision of facilities for Divyangjan at 9 No. of Stations in ADENJTJ Subdivision. AB,VN,GYM (NSG 5), KDY,VGM,PCKM,MPI & VLT (NSG 6), MEH (HG 3). b)Provision of facilities for Divyangjan at 10 No of Stations in AJJ-CGL Section. CJ(NSG4),TMLP, WJ, PALR(NSG6), TKO,NTT, PYV, VB, RDY (HG3),CJE (HG1). c)Provision of facilities for Divyangjan at 11 stns ( WJR,SHU,KVN, LTI, SVUR, THL, TUG, CTRE,MCN, AVN & VJ) in ADEN/KPD subdivision)
Atleast 6m away from track centre within railway land by saw cutting/breaker as per site conditions to avoid any damage to nearby site complete in a manner as directed by the Section Engineer in charge at site. Above/
Provision of facilities for Divyangjan at 8 No. of Stations in AJJ - RU section. EKM&PUT (NSG5), POI,NG, VGA, TDK & PUDI (NSG6) and VKZ (HG3).-Electrical arrangements thereof
Atleast 6m away from track centre within railway land by saw cutting/breaker as per site conditions to avoid any damage to nearby site complete in a manner as directed by the Section Engineer in charge at site. Above/
Electrical work in connection with (i) Provision of 2 Family suits and 6 individual suits at ORH GZB in lieu of Old ORH. (ii) Construction of underground tank & pump house, electric sub-station, improvement to water supply system under ADEN/GZB (iii) Augmentation of homing capacity of ELS/GZB from 200 to 225. (iv) Reorganization of facilities available in Shed and shop at ELS/GZB. (v) Provision of effluent treatment plant at ELS/GZB.
Supply, Installation, Testing and Commissioning of 1200 mm sweep, BEE 5 star rated, ceiling fan with brush less direct current (BLDC) motor, class of insulation B, 03 Nos blades, 30 CM long down rod, 02 Nos conopies, shakle kit, safety rope, copper winding, Power factor not less than 0.9, service value (CM/M/W) minimum 6.00, Air delivery minimum 210 Cum/Min, 350RPM ( tolerance 24 as per IS: 374-2019 or latest) THD less than 10%, remote or electronic regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C ( max), insulation resistance more than 2 mega ohm, suitable for 230 V, 50Hz, single phase AC supply, earthing etc. complete as required. It shall also include the scope of supply and installation of safety cord of SS as per IS:302 Part 2 Sec-80. Dia & length of such cord shall be as per recommendation of OEM of fan and same shall be approved by railway & as per explanatory note.
Providing, Supplying, Lowering Laying and Jointing of 90mm dia. PVC Pipeline, Const. of RCC U.G. Sump Cap. 1.00 Lac Litre and Pump Cabin (2m x 2m) for Dalitvas (Dhori) Under SCSP Programme 2024-25. (2nd attempt )
Purchasing and supplying at site of work with Railway freight
Through Turnout Renewal (TTR) including TWS/CMSC/TSR, Complete track renewal and Through Rail Renewal (TRR) work at Dukheri, kesri & Barara Station under ADEN/UMB.
1660.00 comprising of renewal of Grooved Rubber Pads, Liners and ERCs without damaging PSC sleepers. Scope includes removal of all fittings, cleaning of rail seat, rail flange at liner seats, and eye of Inserts with wire brushes and applying Grease Graphite Grade "O" (IS:408) to eye of insert and central leg of ERC with contractor's grease of Railway's specification, fixing all fittings in correct position and sealing liner edges with grease all complete including collection and stacking of released materials at nominated locations within SSE Jurisdiction as directed by Engineer-in-Charge. Note: All the fittings will be supplied at SSE/Stores/Depot. Lubrication of fish plated rail joints under traffic, by using Grease Graphite Grade 'O' (IS:408) and Black oil supplied by contractor, for all types of rail sections as per procedure laid down in latest version of IRPWM and as directed by Engineer In charge. Note: Release U/S bolt & nuts is to be deposited back. If any fish bolts is jammed it should be cut with chisel and hammer and replaced with fresh fish bolt supplied.