Loading…
Loading…
2,333 results • Best match
DVG - Reconstruction of staff quarters 12 units in lieu of dilapidated Quarters type- II No. 8/A-D, 11, 33/A-B, 43, 46/A-B and 52/A-B at DVG.
foundation of size 300 mm x 300 mm x 300 mm with RCC cable marker casted as single unit and marker shall be placed vertically with lettering portion above GL (remaining below GL) and refilling the pit, as per the instruction of Railway representative at site. NS 1.00 Numbers 41225.20 41225.20 AT Par 41225.20 Description:- Supply, installation, testing & commissioning of centrifugal type vertically multistage bore-well submersible pump as per the following technical specification. The Pump model QF duty point will be Flow 120LPM @ working Head 110 Mtr. The Pump design will be the Flow Range starting
HRR - Reconstruction of staff quarters at HRR Type-II 12 units in lieu of dilapidated Qtrs. type-II No. 8/A-D, 11, 18/A-C, 20/A-B, 34/A-B at HRR station.
foundation of size 300 mm x 300 mm x 300 mm with RCC cable marker casted as single unit and marker shall be placed vertically with lettering portion above GL (remaining below GL) and refilling the pit, as per the instruction of Railway representative at site. NS 1.00 Numbers 41225.20 41225.20 AT Par 41225.20 Description:- Supply, installation, testing & commissioning of centrifugal type vertically multistage bore-well submersible pump as per the following technical specification. The Pump model QF duty point will be Flow 120LPM @ working Head 110 Mtr. The Pump design will be the Flow Range starting
Erection of HT LT TC & maint. Work in various schemes under Bhuj city1 sdn
ERECTION OF STEEL POLE OF 13 METERS FOR RAILWAY CROSSING ON BG/MG/NG LINE FOR 0.400/11/22KV OVERHEAD LINES I.E
Work of Supply, Installation, testing and commissioning earthing for transformer center with Maintenance free, ready capsule, Pipe-incage (PIC) type earthing and connections to the various parts of transformer center using GI Strip and GI nut bolts ... required work to ...
Preparation of site drawing and approval of Railway for cable laying is in scope of contractor, Insurance & liabilities
HYB Division: Annual repairs/maintenance of quarters and service buildings under the Jurisdiction of SSE/W/KCG and SSE/W/WW/SC of ADEN/Estates-II/HYB for a period of one year (2026-2027)
100.00 "CHERIYAL" scroll painting depicting the series of Telangana folk tradition confined to the village Habitment by CHERIYAL. Artists using bright and bold colours at Railway Premises above 4.0 m and upto 8.0 m height with all contractor's artists, helpers, colours, tools and plants etc. as per required and as directed by the engineer-in-charge including GST.
Tender for Service required for Restoration to attend leakage of Icchapore Raw Water 16 FRP Pipeline including Liaison work with NHAI & Govt Bodies, Taxes, Insurance, Freight, or any other charges
Pump House & it’s Painting work (B) Near ONGC Railway Crossings FRP pipe