Loading…
Loading…
1,562 results • Best match
PROVN OF DEDICATED POWER SUPPLY TO PAR RADAR AND IMPROVEMENT TO ELECTRIC INFRASTRUCTURE AT TECH SITE FOR SRE RADAR AT AF STN GWALIOR
Outgoings for Distribution Network MCCB 100 Amps, 16 KA 415V 4 Pole with thermal magnetic based release with O/L & S/C protection. -01 No.(O/G) for PAR Panel 03 set LED phase indicating lamp with 2A SP MCB. 03 set 63/5A Class-1, CT 01 set 0-63A Digital Multifunction meter Capacitor Panel (30 KVAR) 30 KVAR APFC Panel with MCCB, APFC relay & Capacitors bank with Suitable Switchgear Incomer 1 no. 63A 415V TP MCCB, 25KA with thermal magnetic based release with O/L & S/C protection. 1 Set ON/OFF/TRIP indicating lamps (LED). 1 Set ON/OFF push buttons. 1 Set LED phase indicating lamps with 2A SP MCB. 2 set 63/5A Class-1 CT 1 No. 0-500 V Digital voltmeter 1 Set 0-63A Digital ammeter 1 No. APFC relay Bus Bars-40 x 10 mm copper bus bar for 3 phase and neutral duly colour coded insulation. Outgoing 6 nos. 20 A, 3P MCB with capacitor duty contactor, ON/OFF push buttons and LED indicating lamps. 1 no. 20 A, 3P MCB without capacitor duty contactor, ON/OFF push buttons and LED indicating lamps. 6 set 05 KVAR capacitor banks (i) MS Steel Sheet enclosure suitable for Outdoor Installation with MS channels (Base) - 01 Set (ii) Provision for receiving Incoming and Outgoing cables through Bottom entry, excluding Termination Kit and Glands - 01 Set
Automation of water supply to Odagaon NAC (24x7 Water Supply)
Automation and SCADA systems enhance water supply operations through real-time monitoring and remote control of equipment. They improve efficiency, reduce manual intervention, and enable quick responses to faults. These systems ensure reliable water distribution, optimize resource usage, and support preventive maintenance across treatment plants and distribution networks.
Maintenance of Various JJY Schemes under District Rural Sub Div. Kota Tehsil Ladpura District Kota
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department. Minimum labour for a following kms pipelines to be deployed. 1 km to 50 km - one fitter-II & one beldar
Unit Rate For Installation of water misting system various sites in the Nagar Nigam Area
Installation of Solar Smart Heat wave Controller and Misting System, Water Consumption & Efficiency: Calibrated to utilize 3000 liters of water efficiently over a 8-hour operational period. Pipeline Coverage: Includes a 100-meter heavy-duty pipeline network for optimal distribution. Fogging Units: 5 to 7 strategically placed fogger groups, with 5 high-pressure fogging nozzles in each group (Total 25 to 35 nozzles) to ensure maximum coverage.Smart Automation: Equipped with a Smart Controller for automated on/off scheduling and misting intervals. Monitoring: Integrated Water Level Indicator to monitor the 3000-liter storage in real-time.(Current/1st year) Including O&M work for 3 to 4 Month with all T&P and Labour also including dismentling of system & keep in JalKal store.
MOHALLA MAGLAPURI MANDI/ WARD NO 06 ME MADAN JAIN SE SHIV MANDIR TAK PAYJALAPURTI HETU PIPELINE AVAM TATSAMBHANDHI KARYA
Supply of all labour, materials, T&P etc. all complete and interconnecting existing system with the extended distribution network at verious points, (140mm to 200mm dia)
WARD NO 10 ME ARVIND SAINI KI DUKAN SE MASJID TAK PAYJALPURTI HETU PIPELINE AVAM TATSAMBHANDI KARYA
Supply of all labour, materials, T&P etc. all complete and interconnecting existing system with the extended distribution network at verious points, (140mm to 200mm dia)