Loading…
Loading…
1,562 results • Best match
Design Construction of 12 MLD Water Treatment Plant and Allied Components, Design Construction of OHSR at Parakulam in Kappur and Allied Works-Pipeline Work
APPENDIX IX (A) LINKING FROM NEWLY PROPOSED PONNATHANATHARA OHSR TO EXSISTING DISTRIBUTION NETWORK :- SUPPLY OF MATERIALS
AS PER TD
O&M BSR 2020/ 7.1 -Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department.
Construction of Cancer Care Centre at North Bengal Medical College and Hospital, Siliguri under North Bengal Construction Division_External electrical installations works
S & F 240 V A.C. Exhaust Fan (EPC Electrical Pvt. Ltd. - Heavy Duty) incl. Cutting hole on wall with Nuts, Bolts, washers etc. on wall and mending good the damages to original finish as per direction of the EIC for following sizes:-
SPECIAL REPAIR/REPLACEMENT OF STREET LIGHT NETWORK , ALLIED WORKS AND PROVN OF CERTAIN SANCTIONED EM WORKS INCLUDING PROVN OF ENERGY AUDIT AT VARIOUS POCKETS OF AFS MUMBAI UNDER GE (AF)THANE
Note :-(a) The following Terms and Reference are also included in the Energy audit - (i) To carry out the audit of power supply and earthing infrastructure (EP&LA) . (ii) To optimize use of electrical infrstructure by studying the HT/LT distribution network and suggest improvements. (iii) To ensure safety and security of electrical and earthing infrastructure in order to avoid fire hazards and electrical accidents. (iv) To achieve enegy efficiency by setting targets for redudction of energy consumption and carry out of energy saving devices. (v) To verift serviceability state of electrical infrastructure. (vi) To monitor CMD(Contract Maximum Demand ) and RMD (Recorded maximum Demand). (vii)To carry out rationalization of transformer in the Stn. (viii)To balance load of DG sets in the Stn. (ix) To check the power factor and suggest improvements. (x) To suggest measure to improve so as to minimize the maintenance and tarrif of the Stn. (xi) To list out defect/ deficiency. (xii)To submit the Findings and Recommendations. NOTE:- (b) The follwong data will be catered in test report - (i) Summary of energy conservation measures. (ii) Description of energy saving projects. (iii) Cost benefit analysis, vendor, or OEM details. (iv) Small briefing session of the report to the management to explain the report and way forward discussion pertaining to recommendation implementation and any constraint resolution from plant management. (v) Entire exercise will be done by Buerau of Energy Efficiency Accreditted Energy Auditor having industry experience of 20+ years.
External Development Works of Admin, Creche, Canteen and Medical Facility Building at SIPCOT Mega Leather Park, Panapakkam in Ranipet District. (Package 3A)
Design, engineering, manufacture, assembly, supply, erection, installation, testing, and commissioning of an 11 kV, 630A, 25 kA (for 3 seconds) HT Vacuum Circuit Breaker (VCB) panel, complete as per specification, shall be both auto and manual operated. The VCB panel shall be suitable for terminating a 3-core 11 kV HT XLPE cable for incoming and outgoing connections, with all necessary accessories and protection as per the standards. It shall be designed for installation in a three-phase, three-wire, 11 kV, 50 Hz AC distribution network with digital metering system with RS485 port and suitable class-1 CTs& PTs complete with all accessories and erected on the provided foundation as per specification and standards etc, complete as directed and approved by the SIPCOT Officers at the site.
Construction of Solar Based Mini Water Supply Scheme with I HP DC Solar Motor Pump on 125mm x 115mm x 90m Deep GPT DT with installation of IM II handpump having potential to Supply Water 2000 LPH Minimum in Upgraded PS Dhaniyabeda Block Musabani Gr12
Rising and Distribution Network with House Connection of 5 Nos. including Platform & Stand post