Loading…
Loading…
1,500 results • Best match
Replacement / Upgradation of HT and LT (11KV/440V) power line distribution network at the main campus DTU, Bawana Road, Delhi 110042 (SH SITC of Sub-station equipment)
Replacement / Upgradation of HT & LT (11KV/440V) power line distribution network at the main campus DTU, Bawana Road, Delhi – 110042 (SH: SITC of Sub-station equipment.).. - Details of items have been attached in NIT
Punad Project Tal Kalwan Dist. Nashik Construction of Pipe Line Distribution Network For Dy at KM 43 of Sule Left Bank Extension Canal
Punad Project Tal. Kalwan Dist. Nashik Construction of Pipe Line Distribution Network For Dy at KM 40 of Sule Left Bank Extension Canal
Repair and maint of LT electricity distribution network, Sub stations in Pawan, Naidu, Ganga, Yamuna Vihar at Old Cantt under GE (East) Prayagraj.
Supply, fixing ( in repair ), connecting to electrical system & testing of LT panel board ,cubical type for out door use, made out of 3.15 mm thick CRCA sheet factory made, totally enclosed of suitable size and supported with 4 Nos MS Angle legs, duly painted with two coats of powder coated paint over one coat of red oxide primer effectively PVC gasket and sealed mounted on PCC blocks double door type with locking arragnegment with handle at front and openable at front &back both side with required hinges heavy duty, compartemtalised suitably including provision for tapping incoming & outgoing electric connections with suitable size of aluminium lugs glands and comprising of the following accessories :- (a) High conductivity aluminium busbar (Set of 4 strips), 4 Nos TPN of suitable rating ,(RYB) for phase and 1 No for neutral mounted on DMC support with heat shrink sleeve-1 Set. (b) Phase indication lamp, LED type(set of 3) -1 Set (c) Display multi functional panel meter with CTs etc : Make : L&T/Legrand/ABB (d) Grouting of panel including earth work as required PCC (1:3:6) type D-2 using 20 mm gradeded stone & plastering with (1:4 )cement sand etc complete.
Surveying, Investigation, Designing, Preparation of Estimate, Preparation of Detailed Project Report for Pipe Distribution Network of lendi Major project tq. Mukhed Dist Nanded
LAYING, HDD AND ASSOCIATED WORKS OF STEEL PIPELINE UNDER JAMSHEDPUR GA (MANGO AND AGRICO AREA) FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC)
This item shall be applicable for the underground steel grid main pipeline & branch pipeline including tap-off for distribution pipelines, valves, barred tees, insulating joints, bends (R=3D), flanges & fittings, accessories etc. and including fabrication, NDT, Testing & Installation of SVs (all types), tie-in of valve assembly including radiography of tie-in joints as per Schematic Layout Drawings and technical Specification alongwith aboveground approach pipeline upto Insulating Joint (including installation of aboveground / underground insulating joint) for various