Loading…
Loading…
10,795 results • Best match
CONSTRUCTION OF CC ROAD AND DRAIN WORK AT WARD 12 MAIN ROAD TO KHATIK MOHALLA MUNICIPAL COUNCIL PORSA DIST MORENA
CONSTRUCTION OF CC ROAD AND DRAIN WORK AT WARD 12 MAIN ROAD TO KHATIK MOHALLA MUNICIPAL COUNCIL PORSA DIST MORENA
Civil works including earth filling and construction of depot buildings, workshop, inspection shed, plumbing, drainage, external development, architectural finishes, road works , design and construction of PEB works of Delhi Metro Phase - IV.
Contract-D2C-08 - "Civil works including earth filling and construction of depot buildings, workshop, Inspection shed, plumbing, drainage, external development, architectural finishes, road works, design and construction of PEB works at Sanoth Depot of Rithala-Kundli Corridor of Delhi Metro Phase - IV."
Construction of center divider work with center lighting work from Niranjanpur square to Mangliya Road opposite of TATA showroom AB Road Lasudiya Indore (OLD AB ROAD) Road Length 07.00km. (Fourth Called)
center divider work with center lighting work from Niranjanpur square to Mangliya Road opposite of TATA showroom AB Road Lasudiya Indore (OLD AB ROAD) Road Length 07.00km. (Fourth Called)
Construction work of C.C. Road at ward no 10 mukharji nagar main road hanuman mandir to pani ki tanki vidisha
Construction work of C.C. Road at ward no 10 mukharji nagar main road hanuman mandir to pani ki tanki vidisha
CC Road Construction Work Meena Basti to Lalapura, Gram Panchayat Bhankri
CC Road Construction Meena Basti to Lalakapura, Gram Panchayat Bhankari. (As per Estimate)
Construction of C C Road Work Pond side Road to Main Road in village -Ramner, YEA (including construction of drain) WC-06
Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm,mixed a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needie, screed and plate vibrators and| finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including all taxes, material, T&P, Machinary. royalty, labour cess all taxes complete. Excluding GST as per E/l.