Loading…
Loading…
1,53,555 results • Best match
Works Contract for Trace cutting work for construction of road from NH side to CISF colony and Surge shaft
Sobha Bridge at 20.530 Km, on Balarampur- Bagmundi Road (SH-4) Restoration of damaged footpath, Protective works, Slope protection works and allied Works under Purulia Highway Division in the District of Purulia.
Tender Inviting Authority : EXECUTIVE ENGINEER, PURULIA HIGHWAY DIVISION, P.W. (ROADS) DIRECTORATE.
Hagnagari to Fazilangar Road - Ch. from 4.00kmp to 7.00kmp - Patch repairing works in stretches under Nadia Division, P.W.Dte. during the year 2025-26
Krishnagar Karimpur Jalangi Road - Chainage from 81.00kmp to 85.00kmp - Patch repairing works in stretches under Nadia Division, P.W.Dte. during the year 2025-26
GENERAL-SR - Urgent protection works at Thookupalam- Cumbummettu road-Urgent protection work in ThookkupalamCumbummettu road at Ch.4/400 -General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
ELECTRIFICATION WORK ON HIGHWAY ROAD AT TINWARI osiya circle to mathaniya circle
Providing and Laying RCC Foundation for Octagonal / Conical Street Light poles, High mast Poles as per Drawing attach at Table P-4 with Following Procedure & All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR .A) Excavation of Pit for Foundation Size upto required depth from Ground level B) Dressing of Pit and Dry stone pitching 200 mm thick including supply of stones and preparing surface complete.C) Providing and laying in position cement concrete of M-10 grade of 75 mm thickness D) Reinforcement for R.C.C. work with TMT bars includingstraightening, cutting, bending, placing in position and binding all complete.E) Centring and shuttering including strutting , propping etc. and removal of form work for Footing and PedestalF) Providing & Fixing of 2 no. Required Size PLB HDPE Pipe & Foundation Bolt with template as per OEM Recommendations.G) Providing and Laying Reinforce cement Concrete of M-25 grade in Footing and Pedestal including Curing the foundation for 7 days.H) Providing and Fixing Nosing Angle 40 mm x 40 mm x 6mm with 2 no. 100 mm long, 10 mm dia. Lugs on each face. Pole Foundation for Octagonal pole from 7 Mtr. To 9 Mtr.