Loading…
Loading…
1,392 results • Best match
Execution of Miscellaneous Repair and Maintenance and upgradation and Construction works in Zone 3 which is a cluster of central warehouse located at Baran Kota I Kota II Kota III Deoli and Udaipur on Annual rate Contract basis
Supplying, installation, Testing & Commissioning of the integrated type solar PV lighting system on the existing pole structure, comprising of 20 watt, 6V Mono Passivated Emitter and Rear Contact (PERC) Solar Panel (minimum efficiency 21%), Pulse with modulation (PWM)/Maximum Power point tracking (MPPT) Charge Controller in the box with a sleek appearance and a sturdy structure, is weather-proof, and is simple to install, With Lithium- Iron Phosphate Battery (LiFePO4),charging time 6-8 hours, Battery backup time 12 hours (minimum), LED fixture 20 watt, Input voltage: 12V DC, Operating temp range -5 °C to 50 °C, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency >85%, IP-66,IK-08, CRI >70 , under voltage and over voltage protection, Electro Magnetic Interference (EMI) Electro Magnetic Compatibility (EMC) As per CISPR 15, lenses for beam angle as per Illuminating Engineering Society of North America (IESNA) type I/II/III as per the width of the road and the project requirement, Correlated Colour Temperature (CCT) 5700°K / (As per American National Standard Institute (ANSI Bin)), life time (LED,Driver & electrical circuitry) of 50K hours lamp buring hours till the 70 % of initial Lumen maintained as per LM80 extrapolation IES TM-21-11 report, automatic swich on/off, Alliuminium or Acrylonitrile Butadiene Styrene (ABS body), can be installed on a pole or wall. System lumen efficacy >120 lm/Watt output. LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted. All as per pre approved by Engineer in-charge complete in all respect i/c external connections with 1.5 sq.mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required, complete with mounting structure for the battery and accessories suitable for withstand wind storm speed as per the site location. (Thermal management: heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C).
CONSTRUCTION OF MSW REFUSE TRANSFER STATION INCLUDING MRF, RRR CENTRE, AND E-WASTE COLLECTION CENTRE, ALONG WITH SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING (SITC) OF MACHINERY/EQUIPMENT FOR BHAVNAGAR MUNICIPAL CORPORATION AT SIDSAR.
1 Supplying and erecting LED Solar street lights with High power White LEDs wattage of 1Watt and above Ea. 22 36,154.97
Supply Installation Testing and Commissioning of Integrated Security Surveillance System at Various Locations in Idukki District
Supply, installation, testing and commissioning of 170W Solar Power System comprising 170W SPV panel, 65Ah 12V SMF battery, 12V 10A solar charge controller with DC adaptor port, DC power supply unit, necessary DC cabling, panel mounting fabrication structure and accessories, designed to provide minimum 24 hours power backup
Canal Water Based Water Supply Project for Construction of 5.00 MLD Water Treatment Plant WTP and other related works including 5 years O and M Part 2 at Samrala Town District Ludhiana Punjab under AMRUT 2 Scheme
Canal Water based Water Supply Project for Construction of 5.0 MLD Water Treatment Plant and other related works including Operation and Maintenance for a period of 05 years (Part-2) and Supplying, Installation, Testing of Solar Panels including other required equipment as per Guidelines of Punjab Energy Development Agency (PEDA) over Raw Water S&S Tanks of Water Treatment Plants with Operation and Maintenance for a period of 07 years under AMRUT 2.0 Scheme Town name Rampura Phul
Salem Division: Construction of New Terminal building at Erode Railway Station- Electrical arrangements.
Erection, testing and commissioning of 500 LPD solar water heater includes providing RCC foundation/terrace mounting, fixing hot-dip galvanized structure with proper south orientation and tilt, installation of solar collectors and insulated storage tank, complete plumbing with CPVC/GI 70 pipes including inlet, outlet, air vent, drain, NRV and PRV with proper slope and supports; electrical works include 230 V single-phase supply through MCB and RCCB, FRLS copper wiring in conduit, thermostat, thermal cut-out, control switch and complete earthing; testing and commissioning include leakage and pressure testing, electrical insulation and earthing tests, system filling, air venting, performance check complete in an approved manner and as directed by Engineer in charge at site. Note:Necessary Solar water heater only will be supplied by Railways.
Improvement of Riding Quality of Kharagdiha-Khijuri Road (Total Length - 16.400 Km.) For The Year 2026-27
Solar Powered Road Marker (Solar Stud) Supplying of Solar Raised Pavement Markers made of polycarbonate molded body with circular shape, solar powered, LED self illumination in active mode 360 degree illumination and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face in passive mode.The marker shall support a load of 20000 kg tested in accordance to ASTM D 4280.The marker should be resistant to dust and water ingress according to IP 65 standards and should withstand temperatures in the range of 0 C to 70 C. Color of lighting could be provided in red or yellow (amber) as per requirement and typical frequency of blinkikng in 1 Hz.There should be current losses of less than 20 microamperes at 2.4 V in sleepcharging mode to enhace the life of the marker and a full charge should provide for a minimum autonomy of 50 hours.The height, width and length of the marker shall not be less than 10mmx100mmx100 mm. Also, the surface diameter of the marker shall not be less than 100 mm respectively.The weight of the marker shall not exceed 0.5 Kilograms.Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive and complete as directed by the engineer.)