Loading…
Loading…
17,124 results • Best match
Estimate No.123005-A of 2025-2026 Providing EI, street Light and Water Pump, On-Grid Solar System, Solar Water Heater to Bhakta Nivas and Sanskrutik Bhavan at Anandmurthy Math Bramhanal, Tal.Palus, Dist.Sangli.
Estimate No.123005 of 2025-2026 Providing E.I, street Light and Water Pump, On-Grid Solar System, Solar Water Heater to Bhakta- Nivas and Sanskrutik Bhavan at Anandmurthy Math Bramhanal, Tal.Palus, Dist.Sangli.
Providing and supplying of Solar PCU Off grid 1 KW MPPT Sine wave Solar Power Conditioning Unit, Providing and supplying of Solar Grid tied inverter Demonstrator kit 300W KW, Providing and supplying of Solar Street Light 12V 75Ah battery 75 Wp solar ... solar panel 12V ... LED lights and ... of Solar wind ... Solar wind and ... hybrid power plant ... power plant 1 ... of Solar Traffic ... Traffic Light 12V ... Wp solar panel ... solar panel 12V ... LED lights with ... Used water treatment ... treatment solar plant ... solar plant demonstrator ... of solar DC ... DC pump 1 ... for wind generation ... generation Wind turbine ... Wind turbine with ... LED lights 12 ... LED lights 6 ...
Providing and supplying of Solar Street Light 12V 75Ah battery 75 Wp solar panel 12V 10A dusk to dawn charge controller 60 W LED lights and 9 m height pole all dismountable
Repair of solar water heater
Repair of solar water heater
in this estimate 1number 20 mt high mast street light solar light and solar power plant is taken.
[32.70.1]Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC (c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency (d) Data Monitoring System complete with accessories. (e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (f) Lightning and surge voltage protection. (g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 1. Above 1 kWp and up to 10 Kwp [Through Rate]
Estimate No. 862/EE/AMT/ 2025_26, Providing Internal Electrical Installation, External Supply, Street Light, Solar Water Heater, CCTV Camera System, Fire Alarm, Water Pump Set to Proposed Hostel Building in the Premises of Sport Complex at AMRAVATI.
Estimate No. 862/EE/AMT/ 2025-26: Providing Internal Electrical Installation, External Supply, Street Light, Solar Water Heater, CCTV Camera System, Fire Alarm, Water Pump Set to Proposed Hostel Building in the Premises of Sport Complex at AMRAVATI.
Design, Supply, Installation, Testing, and Commissioning of a 20 kW On-grid Rooftop Solar Power Sys
and Commissioning of a 20 kW On-grid Rooftop Solar Power Sys