Loading…
Loading…
3,736 results • Best match
Hyderabad Division: 53 High mast lights at 10 Goods shed GJWL-4, MDAK-7, DHP- 4, BDHN-5, SIPT-4, JKPT-9, JCL-3, GWD-4, ALPR-9 & VDI-4 of Hyderabad Division- Electrical Arrangements
Supply, fixing, connecting and commissioning of 60W LED street light complete with necessary clamps and hardware etc. as per Railway specification
Electrification work in connection with "Khandwa - Improvement to water supply lines from filter house to RCC tank of Ghaspura colony and chidiya maidan colony and extension of WRP water supply line from PF No.5 to PF No. 1/2 and repairs to pump installation of Aabna pump house, filter house and Pump room No.01".
Supply, Erection, Testing and Commissioning of LED street light in Alluminium PDC housing
Refer Tender Document
90.15.4.1:Supply Conveyance, installation, testing and commissioning of 20W LED street light output greater than 105lumen/W 4000-6000 K with IP 66 protection LED Chip make Cree/Lumilled/Nichea with power factor greater than 0.95 at full load, internal surge protection up to 8 KV,and Aluminium pressure die-cast Powder coated housing,acrylic cover complete with THD Less than10%, power factor greater than 0.98, RoHS compliant, duly wired up for use on 230 V AC supply. Driver compartment should be seperatly accessible for maintenance (LM 79&80 certificates from NABL accredited Third party lab to be produced mentioning chip manufacturer)
Ujjain- Providing barrack having 20 bed capacity with toilet facility at (Composite Civil + Eeltrical )
30 30 Supply & fixing of LED Street light 45W including Numbers 7.00 2958.11 20706.77
Panel Board Fixing, Borewell Pump Fixing and other small works
90.15.4.1:Supply Conveyance, installation, testing and commissioning of 20W LED street light output greater than 105lumen/W 4000-6000 K with IP 66 protection LED Chip make Cree/Lumilled/Nichea with power factor greater than 0.95 at full load, internal surge protection up to 8 KV,and Aluminium pressure die-cast Powder coated housing,acrylic cover complete with THD Less than10%, power factor greater than 0.98, RoHS compliant, duly wired up for use on 230 V AC supply. Driver compartment should be seperatly accessible for maintenance (LM 79&80 certificates from NABL accredited Third party lab to be produced mentioning chip manufacturer)
Electrical arrangements for: 1. MS-VM- Improvement to platform and allied works at POTI, CTM, MMNK, SKL, PWU, OV, KGZ, MMK, MLMR, ACK, TZD, OLA, TMV, MTL, PEI, VVN & MYP stations under ADEN/CGL Sub-division. 2. MS-VM- ADEN/CGL Sub Division - Improvement to platform No. 3 Downline and Improvements to Approach roads at Padalam (PTM) Station).
supply connection from ceiling rose/junction box or elsewhere by using 3 core 1.5 sq. mm Fire retardant low smoke PVC insulated, PVC round sheathed copper [White/Ivory colour] conductor flexible chord conforming to IS:694/1990 or latest as per industrial standards in a manner as directed by Section Engineer in charge at site. Note: 45W LED street light fittings alone will be supplied departmentally. Above/