Loading…
Loading…
595 results • Best match
Tender for the Bi-Annual Rate Contract for (1) Shifting/Modification work of existing various 66/132/220 Kv class transmission lines under Junagadh Circle and (2) Emergency restoration work of 66/132/220 Kv class transmission line on tower/H-Frame structure under Junagadh Circle
switchyard, “permit to allow to work” must be isolated /de-energized and written clearance should
EXPANSION, DIGITIZATION AND OTHER RELATED CIVIL WORKS OF THE ELECTRICAL MUSEUM LOCATED AT THE IT TRAINING CENTRE AGRA.
Providing, designing, 3D printing, fabrication, assembling, testing and installation of complete Thermal Power Generation System Model on 48" × 72" size, 19 mm thick wooden base board with mica laminate finish, including supply of all materials, labour, tools and tackles required for the work. The model shall consist of accurately scaled and detailed Coal Storage Yard, Coal Handling Plant, Boiler, Superheater, Economizer, Air Preheater, Steam Turbine, Alternator/Generator, Condenser, Cooling Tower, Chimney, Ash Handling System, Water Treatment Plant, Generator Transformer, Station Auxiliary Transformer, Switchyard, Current Transformers (CTs), Potential Transformers (PTs), Isolators, Circuit Breakers, Lightning Arresters, Busbars, Control Room Building, Transmission Line Outgoing Bay, Earthing Grid, Cable Trenches, Internal Roads, Structural Supports, Interconnections and all other associated thermal power plant equipment and structures. The work shall include 3D printing, painting, colour coding, identification labeling, fixing, detailing, demonstration arrangement, installation of all accessories, testing, commissioning and all allied works required for complete and satisfactory operation of the model, including transportation to site and installation, complete in all respects as directed by the Engineer-in-Charge.
As per SBD
Extension of already laid retaining wall (RW04) between 220/132 kV transformer bank and 132 kV switchyard
Providing SOP to LIS to Gram Panchyat Tihra, Kot, Greyoh, Cholthara, Sadhot, Sajao piplu, Darwar under JSV SDTihra under PMKSY(har khet ko pani) from 11KV S/Stn. Tanihar under ESD Tihra under ED Dharampur. (33KV HTline from 33/11KV 1X3.15MVA S/Stn.
Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount Basic Rate of Erection GST @ 18% on total Erection Per Unit Rate of Erection i/c GST Amount(In Rs.) Labour Cess@1% Total Amount(Erection i/c GST+Labour Cess) Estimated Rate i/c all taxes+labour cess etc. Estimated Total Amount i/c all taxes+labour cess etc. Uniform Rate of Percentage offered by the contractor to execute the work i.e., @ 10% Total Awarded Amount
Work of feeder maintenance and consumer complaint redressal pertaining to 33/11 KV Sub-Station Haldi under EDD Khatima in O and M head, as per tender specification.
Annual maintenance of lines, substations, DTRs, and redressal of consumer complaints under 33/11 KV Substation Haldi (Khatima), under EDD, Uttarakhand Power Corporation Limited Sitarganj (O&M Head).
Upgradation of existing 2x20MVA, 66/11KV Hirehalli sub-station to 2x150 MVA, 220/66/11kV GIS sub-station along with construction of associated 220kV transmission line for a distance of 0.805Km, and 66kV Lines for a distance of 46.968Km and laying of 66kV UG Cable for a distance of 1.6Km in Tumakuru taluk & district.
SS30 V. Sub-station Automation System including erection: (As per Annexure – SAS of Relay & Protection Panels and Sub-station Automation specification) Note: 1)The Accuracy class of metering core of CTs and also trivector meter of control & relay panels shall be 0.2s class and 0.2 for CVT & VT instead of that specified elsewhere in the respective clauses of Technical specification of bidding documents. 2)All the panels shall be of one and the same make for uniformity and interchangeability of components. 3)The Electronic Trivector meters with DLMS protocol & ABT features has to be provided both on the HV side and LV side of both 220/66kV transformers & 66/11kV Transformer. 4)Firm should provide sub station automation system at 220kV Hirehalli sub station on 6185 protocol & automatic energy meter reading facility. Data should be integrated to local SAS & to SLDC, Bengaluru using IEC 60870-5-104 protocol. Set 1