Loading…
Loading…
3,993 results • Best match
Diversion of 220 KV Gorakhpur(PG) - Bansi D/C Transmission line between location No. 09 to 14 under Electricity Transmission Division-II, Basti H.Q. at Siddharthnagar
(a) Destringing of all 3 phase conductor & Earthwire between towers of following lines 1-220KV GORAKHPUR (PG)- BANSI LINE (1.5 Km) (b) Stringing of 3 phase Conductor & Earthwire in between tower loc no various Line 1-220KV GORAKHPUR (PG)- BANSI LINE (1.5 Km) after erection of ERS tower and jumpering at both end and associated works. (c) Destringing of all 3 Phase conductors of ERS Line section of following lines 1-220KV GORAKHPUR (PG)- BANSI LINE (1.5 Km) and safe removal of ERS Towers after restoration of main transmission through newly constructed M/C Line and properly rolling of conductor in drums (Provided by department) and safely shifting of conductor in the store under ETD-2, Basti.
Providing Protection wall for the Tower No 94 and 97 at 66kV Bhakra Una Transmission Line Under HPPTCL PIU Tahliwal at Una Distt Una HP Transmission Line, Under HPPTCL, PIU Tahliwal at Una, Distt Una HP.
Diversion of 132KV Bansi-Rudhauli S/C Transmission Line Between Location No. 04 to 05 on DC Tower under Electricity Transmission Division-II, Basti, H.Q. at Siddharthnagar
Survey including preparation of schedule of materials, marking of locations (Router Length). GPS Survey of line with co-ordinates of each tower (The length of line shall be authenticated by GPS Survey).
Protection work for tower foundations at various locations of 132KV Janipur Jhajjarkotli Udhampur transmission line
Work of leg painting and supply and installation of tower accessories in 132KV D/C Hatia II to Kanke Transmission Line under the jurisdiction of Transmission Sub Division Kanke
Protection of tower legs and chimney with RCC plinth at Loc. No- 42 and 44 of 132 kV D/C Chandil-Golmuri Transmission line under Transmission Sub-division, Golmuri