Loading…
Loading…
3,978 results • Best match
For providing retaining wall in Tower Loc. No. 25 of 132 KV D/C Bhagodih-Garhwa Road Transmission line under Transmission Sub Division Garhwa Road
Design Engineering Supply of Materials/ Equipments Erection Testing and Commissioning of 220 kV DC Baliyapur - Maithon Transmission Line on turnkey basis
Covering of Electrical transmission line at Gouripur Mandal Para under Ratua-II Dev Block
Construction of Protection of Tower Footing at location nos. 18 and 44 of 220 kV D/C Govindpur-TTPS Transmission Line under Transmission Sub-Division, Govindpur.
Renovation of Water Transmission Arrangements from Existing RCC Pipe Line to UPVC Pipe Line at Nasibpur DTW (HG-150) at Mouza-Nasibpur, JL No-90, Plot No-4021, Block-Singur in the District of Hooghly under Chinsurah (A-I) Sub-Division of Chinsurah (A
a) Testing of pipe line system against leakage by filling the distribution chamber with water and supplying water through the entirepipe line net work for at least 4 (four) hour including hiring and transport of suitable generator, pump, tools and plants, fuel and lubricants, installation of the pump, connecting the same with pipe line net work, making necessary electrical connection and dimantling all these after completion of test - all complete as per direction. i) For H.D.T.W.
Diversion of 220 KV Gorakhpur(PG) - Bansi D/C Transmission line between location No. 09 to 14 under Electricity Transmission Division-II, Basti H.Q. at Siddharthnagar
(a) Destringing of all 3 phase conductor & Earthwire between towers of following lines 1-220KV GORAKHPUR (PG)- BANSI LINE (1.5 Km) (b) Stringing of 3 phase Conductor & Earthwire in between tower loc no various Line 1-220KV GORAKHPUR (PG)- BANSI LINE (1.5 Km) after erection of ERS tower and jumpering at both end and associated works. (c) Destringing of all 3 Phase conductors of ERS Line section of following lines 1-220KV GORAKHPUR (PG)- BANSI LINE (1.5 Km) and safe removal of ERS Towers after restoration of main transmission through newly constructed M/C Line and properly rolling of conductor in drums (Provided by department) and safely shifting of conductor in the store under ETD-2, Basti.