Loading…
Loading…
3,992 results • Best match
Construction of 220/132KV, 2X160 MVA AIS Substation at Morigaon along with associated transmission lines, (Package P-II-E)
Digital Carrier Equipment Panel (Twin channel and should support transmission band for line length 240 km) for 220kV
Supply and Installation of Transmission Line Surge Arresters for 132kV BTPS Dhaligaon D/C TL and 132kV Dhaligaon-Gossaigaon S/C TL
Supply of Transmission Line Surge Arrester (TLSA) suitable for using in 132kV Transmission line along with all accessories required for installation
SPECIFICATION FOR IMPLEMENTING DRONE BASED AERIAL PATROLLING AND THERMO VISION INSPECTION OF IMPORTANT 400 220 132 KV TRANSMISSION LINES UNDER P and M PSTCL
Drone based aerial patrolling and thermovision inspection of IMPORTANT 400/220/132 KV TRANSMISSION LINES UNDER P&M PSTCL. (Gross value of prject by adding charges for 400 KV lines, 220 KV lines and 132 KV Lines)
Work for Carrying out Routine Patrolling, Preventing/Breakdown/ Shutdown Maintenance of 132 KV Transmission lines under Sub-Division Simdega from 01.06.2026 to 31.03.2027 of financial year 2026-27.
Measurement of Earth Footing Resistance of Transmission Line Towers at an interval of 1 KM by electrical resistivity method or by ERM Method. (Total Line length- 126 KM)
Assistance in carrying out miscellaneous routine and preventive maintenance work of 132KV transmission line under OandM Division, PTCUL, Kashipur
Deployment of highly skilled fitter/technicians for the routine/breakdown maintenance of 132KV transmission line capable of working on earth wires/conductor etc. (Highly skilled - 03 manpower). (a) O&M Sub Divison, Kashipur - 155 Operations (b) O&M Sub Divison, Bazpur - 200 Operations (c) O&M Sub Divison, Ramnagar - 300 Operations
Annual maintenance work of 220 KV Chandil STPS, 220 KV Chandil PGCIL and 132 KV Chandil Manikui transmission line for the period from 01.04.2026 to 31.03.2027
Routine Monthly Patrolling of 220 KV Transmission Lines (56 Km/Month) including tree prunning, repositioning of earth wire, checking, tightening & positioning of fasteners, all Jumpers etc and back filling of Earth errosion of tower legs along the corridor and vehicle with fuel & driver required for the work. (i) 220 KV Chandil-STPS S/C Transmission line from Loc. No. 336 to 254 (12 month x 28 Km/month=336 Km for 12 month) (ii) 220 KV Chandil-PGCIL D/C Transmission line from Loc. No. 332 to 92 (12 month x 80 Km/month=960 Km for 12 month) (iii) 132 KV Chandil-Manikui S/C Transmission line from Loc. No. 1 to 3 (12 month x 0.5 Km/month=6 Km for 12 month) i.e. Total for 365 days/ 1 year = (336+960+6) Km = 1302 Km.