Loading…
Loading…
4,662 results • Best match
Construction of 2 Nos. of 11KV Link lines for a distance of 16.52 Kms from 33/11KV Kalloli Substation in Ghataprabha sub division of O&M Division HESCOM Ghataprabha on Total Turnkey Basis.
HT line in Rkms LT line in Rkms DTC in Nos
Drawl of 2 Nos 33 KV lines one from new bay of NT ID 132 KV GSS and another from Newtown AA-IB Sub-Station with const. of a feeder bay and others works to facilitate 33 KV Bulk service connection to the CEO,Sec-VI ITA NT-WTP under Newtown Division.
Conducting physical survey of HT lines using Vidyut manchitra map and subsequent data uploading and data validation with providing necessary logistic support like mobile device , SIM card,power bank,pcs,internet connection etc for the purpose of GIS field survey and updating of GIS mapping
REPAIR MAINT OF LT CABLE AND MISC CONNECTED ITEMS AT NO 2 NO 3 AND TECHNICAL AREA AT AIR FORCE STATION PATHANKOT
Material and labour To find out fault in LT line bring/call fault finding machine equipment and find out fault in any size of LT underground Cable including disconnecting of cable connection from both side panels/poles and necessary excavation to reach upto cable and making space for cable joint complete all as specified and directed by Engineer-in-charge.
UTILITY SHIFTING AT BOTH SIDE OF POLAYATHODU RAILWAY CROSS IN FAVOR OF KRAIL
(174) Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.
REPAIR AND MAINT OF LT OVERHEAD LINES, ACSR CONDUCTOR, INSULATORS AND CONNECTED WORKS AT RV COLONY UNDER GE I R AND D KANPUR
S&F Pin type, pocelain, vitreous, white brown or green insulator including one galvanised mild steel spindle, two galvaanised iron washers and one galvanised iron nut, 150mm height, 150mm dia for 11000 volts grade complete all as specified for HT lines fixed on poles.
REPLACEMENT OF BROKEN PCC POLE 9 MTR. LONG, PVC INSULATED CONDUCTOR 30 SQMM TO AVOID STREET LIGHT FAULTS, PVC SPACER AND OTHER ALLIED WORKS IN SECTOR-18 U/E KAITHAL. (INCLUDING ONE YEAR FREE MTC. AND DEFECT LIABILITY PERIOD FREE OF COST)
Supply and Erection of Stay set for LT line complete with GSS 7/8 SWG, Egg, insulator/ Disc Insulator, GI rod 20mm dia threaded up to 250mm length with Nut (wt.6.224kg), cross plate 460 mm of Channel 75×40×6mm (wt.5.330kg), Elbow (wt.2.240kg), clamp with Nut-Bolts etc. as per UHBVN specification complete in all respect up to the entire satisfaction of Engineer-in-charge.