Loading…
Loading…
4,668 results • Best match
67/E.D.C.(G.)/2025-26
Installation of Mounting of Following capacity of Transformer including its connection between 11 KV and LT Line.
01/2026-27/
Installation of Mounting of Following capacity of Transformer including its connection between 11 KV and LT Line mounting provinding Crimping type Aluminium lugs of required size.( All the material except transformer will be arranged by the contractor)
CONSTRUCTING 600M HT ABC AND ERCTING 100kVA TRANSFORMER AT KILAVIKULAM-2 at udumbanchola
Fitting one No. Section fuse on LT line with dropping cables, crimpingsockets, connecting with bolt&nut etc.
76/2025-26/
Installation of Mounting of Following capacity of Transformer including its connection between 11 KV and LT Line mounting provinding Crimping type Aluminium lugs of required size.( All the material except transformer will be arranged by the contractor)
SHIFTING OF ELECTRICAL UTILITIES ALONG PARAPPANPOYIL-KARAKUNNATH ROAD (KUTTAMBOOR TO KARAKUNNATH ) AT ELECTRICAL SECTION KAKKUR
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.
Line Extension-OYEC in favour of EXECUTIVE DIRECTOR ( 1157136016447 ) under Electrical Section, Keerampara
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.