Loading…
Loading…
4,709 results • Best match
Combined package for Work A Establishing of 2X20 MVA, 66/11 kV Sub-Station at Yarappanahalli along with Running of 66kV, 1000sqmm S/C UG Cable from existing 220/66/11kV Devanahalli Hardware Park (KIADB) S/S to proposed 66/11kV Yarappanahalli S/s for a route length of 9.865Kms and Construction of one No of 66kV Terminal Bays at Existing 220/66/11kV Devanahalli Hardware Park (KIADB) S/S for terminating 66kV 1000sqmm UG Cable from proposed 66/11kV Yarappanahalli substation in Bengaluru East Taluk, Bengaluru Urban District. Work B Establishing 2 X 31.5 MVA, 66/11KV SubStation at KONADASAPURA-2 (Katamanalluru Village) along with Running 1.805Kms 66KV, 1000 Sqmm S/C UG Cable from existing 66/11KV Konadasapura (Safal) S/S to proposed 66/11KV Konadasapura-2 sub-station and Running 11.610 Kms 66KV, 1000 Sqmm S/C UG Cable from under construction 220/66/11kV Whitefield (Hagaduru) GIS S/s to proposed 66/11KV Konadasapura-2 sub-station in Bengaluru East Taluk, Bengaluru Urban District on Partial TurnKey basis including supply of all matching materials/equipments (Excluding supply of 11 kV Switchgears) and erection (including civil works) of all materials/equipments, testing and commissioning.
... effective Erection, Testing, Commissioning & Operation of the Equipments of Substations & Transmission lines shall also be furnished by us, at no extra cost to you.
Shifting and relocation of existing electrical installation due to impvt. Such as widening and strengthening of Bandalo Enderpada road from 0.00 Km to 5.300 Km under Chatia Section, Jajpur
PART F: Construction of 1.2 KM LT line using WPB pole & (4C×70 mm² (P)+1C×70 mm²(M)+1CX16 mm²(Street Light) LT AB cable (Refer PSLD)(To be executed by party & maintained by TPCODL under 6% Deposit work Scheme). WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) (Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG)
Construction of 1.5 km, 33kV line to Elamkulam SS using XLPE CCSX 120sqmm AAAC CC, except stringing (Retender)
221 - Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
Construction of 33/11 KV power/feeder line for 33/11 (1X10 MVA) Sub Station at IA. Kosi Kotwan Extension-II, District Mathura under Atal Industrial Infrastructure Mission 3.0 (2024-25).
Supply and erection of stay of HT lines for ST pole with GI anchor plate (152x152x6mm) stay rod (16mm dia x 1.85 m long) GI ...
Providing SOP to LIS to Gram Panchyat Tihra, Kot, Greyoh, Cholthara, Sadhot, Sajao piplu, Darwar under JSV SDTihra under PMKSY(har khet ko pani) from 11KV S/Stn. Tanihar under ESD Tihra under ED Dharampur. (33KV HTline from 33/11KV 1X3.15MVA S/Stn.
(Supply Part) of 11 KV HT Line HT Line of 63 kVA, 11/0.4 kV Sub-Station of GSSS Science Lab Baroti in (E) Section Baroti UESD Dharampur.
Construction and Maintenance of Power and Electrical works etc at Dhajanagar and Sarasima Industrial Estates PACKAGE 14
Supply Installation and Commissioning of Indoor 33 KV 1200Amp 4 Panel VCB Breaker Panel (Including One Incomer & Three Outgoing) with inbuilt Line CT, PT, Power Pack and Transmission Line Protection Protection for I/C panel & 1 no O/G panel and Transformer protection for 2 O/G panel etc all complete as per approved drawing