Loading…
Loading…
690 results • Best match
eEquotation for rate of materials for Schedule rate jharkhand under D W and S Division, Chaibasa
Designing (aesthetically), and constructing RCC elevated service reservoirs of following capacity with RCC staging Consisting of columns, internal and External bracings spaced vertically not More than 4.5 metres centre to centre for ESR having capacity upto 500 cum and Not more than 6m c/c for ESR having Capacity above 500 Cum including Excavation in all types of strata, foundation concrete, cement plaster with water proofing compound to the in side and out side face of the container and also plaster with plastic paint in all Columns and Bracings including refilling disposing off the surplus stuff with in a lead of 50 metres, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypass arrangements as per departmental design, providing and fixing accessories such as M.S. ladder out side, Stainless Steel lader in contenor, C.I. manhole frame and covers, water level indicators,lightening conductor, G.I. pipe railing around walk way and top slab, providing stair case from ground level to roof level, M.S. Grill gate of 2M height with locking arrangement of approved design, B.B. Masonry chambers for all valves, ventilating shafts, providing and applying three coats of Acrylie emulsion with silicon edditives paint to the structure incluing roof slab, epoxy painting to internal surface and anti-termite treatment for under ground part soft he structure and giving satisfactory water tightness test as per I.S. code. The job to include painting then ame of the scheme and other details on the reservoir as per the directions of Engineer In - Charge.
Operation of PWS/WLS piped water supply schemes (Quality affected/NQ affected) by deploying pump operators and payment of electricity charges and II. Comprehensive maintenance of PWS/WLS water supply schemes (Quality affected/NQ affected) i/c the cost of chemicals, overhauling of filter media and related apputenances, cleaning of ESR and campus, maintenance viz. claning painting of pump house, boundary wall, repair of leakages in districbuition line, repair and provision of new FHTCs, repair amd maintenance of pumps and other electromechanical components etc. all complete as per
1 Boring/drilling bore well of required dia for casing/strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, upto 90 metre depth below ground level. (All types of soil)
Invitation of e-Quotation for framing of SOR-2026-27
Scrap tyres of size 900 x 20
Construction of 220KV D/C Transmission Line from PMTL, Chandauti to IMC ,Dobhi (RL - 22.9 KM ) with ACSR Zebra Conductor along with Construction of 02 nos. 220KV Line Bays at Chandauti PMTL Substation on Turnkey basis.
4.11 Battery and Battery Chargers
SUPPLY OF AERIAL FIRE FIGHTING EQUIPMENT
Power Distribution Module/ Power and Control Module Power distribution module shall be compact and portable. Electrical power for operation of the system shall be independent of helicopter power. The bucket shall be connected to the Power Pack by a breakaway plug, in case of emergency jettisoning requirement and force required for the same shall be specified. Amount of force required for breakaway shall be lesser than the empty weight of the bucket itself and the same shall be specified. Power distribution module shall typically comprises of the following: • Battery • Control Pendent (2 nos) • Electrical cable with breakaway connector • Battery status indication • Charging port Anchor points shall be provided for fixing the power control module equipment on helicopter floor board. The Power Pack shall be strapped/mounted to the floor of the helicopter. Following control shall be available in power pack control pendants: • Dump switch • Shallow Fill Pump switch • Foam controller switch Power distribution module shall have breakaway connectors in power connecting lines for easy jettison of bucket in case of emergency and shall have provision for grounding harness to prevent static charge buildup. Power distribution module shall be compatible for 6 to 10 hrs of operation and complete recharge within 2 hours (desirable). Charger shall be compatible with 120 VAC/60 Hz or 220 VAC/50 Hz power sources. The Power Pack shall also include a dump switch harness to operate the bucket valve, a bucket wiring harness to connect to the bucket and a grounding harness to ground the system to the airframe to eliminate static charge buildup. All of the wiring harnesses and power cords shall be stowed inside of the Power Pack casing. A manually operated circuit breaker shall be available on casing to disconnect the battery power from the bucket harness. Characteristics • Helicopter Power Supply: 28 VDC • Charger Voltage: 120VAC / 240VAC • Charger Power Frequency: 50 Hz • Charger Socket: Shall be specified by vendor • Battery Type: Shall be specified by vendor • Battery Capacity: 6 to 10 hrs of operation • Recharge Time: 2 hours (Desirable). Actual time shall be specified by vendor • Physical Size & weight: Shall be specified by vendor o Battery o Control Pendants o breakaway connector etc. • Breakaway connector separation force : Shall be specified by vendor
Supply of lab items and other items
Blood Collection monitor that Should have slip free safety clamp, detachable tray with integrated filter holder, LCD display, audible alarm alert function, volume selection function for all types of bags, 12hr minimum battery backup, with standard accessories, biannual calibration with 36 months complete standard warranty. Blood Collection monitor that Should have slip free safety clamp, detachable tray with integrated filter holder, LCD display, audible alarm alert function, volume selection function for all types of bags, 12hr minimum battery backup, with standard accessories, biannual calibration with 36 months complete standard warranty.