Loading…
Loading…
689 results • Best match
Neurovascular Intervention Implant for Neurosurgery Department
ᨀࠀᤀऀᨀጀᤀ᐀ᨀᬀᤀ䔀ᴀ䘀ᤀ堀ᴀ夀ᤀ渀ᴀ漀ᤀ謀ᴀ谀ᤀऀDistal Protection device for Carotid angioplasty and stenting: Optimal Working Lengths Must be FDA/CE approved Flexibility to use other micro guide wire option Filter/Umbrella types Small crossing profile
DRY UNCHARGED LEAD ACID STORAGE BATTERY
Description :DRY UNCHARGED LEAD ACID STORAGE BATTERY FOR MOTOR VEHICALS. CONFIRMING T O IS: 7372/95 WITH AMDT. NO. 1 DIAMENSION SHALL BE AS PER TABLE IS: 7372/1995 WITH AMDT. NO .1 VOLTAGE AND CAPACITY AT 20 HOURS RATE OF DISCHARGE AT 27 DEGREE CELCIOUS SHALL BE AS UNDER VOLTAGE 12 VOLTS CAP. 75 AH 1310 DRY UNCHARGED LEAD BATTERY FOR MOTOR VEHICLES. [ Warranty Period: 30 Months after the date of delivery ] [Quantity Tolerance (+/-): 1 %age , Item Category : Normal , Total PO value variation Permitt ed: Max 8 lacs ] ] Dy.CMM(GSD)HUBLI, SWR Karnataka 84.00 Numbers Consignee MGSD/AP, SWR Karnataka 9.00 Numbers Inspection Stage Inspection Not Required Details
Annual Rate Contract for Normet Make Spares.
TYRE TUBE Part No 54845060
SPO/TN-222/Establishment of Common Incubation Centre for processing of fruits, vegetables at COH, Bidar including of Construction Works
Fixing all types and all capacities fluorescent or false ceiling or spot light or CFL or LED fittings indoor on the wall or ceiling or rafters or girders using 23 or 0.00076 " twin twisted PVC insulated wires, required nos of round blocks and clamps. On wall or ceiling or Rafters or Girders
Supply & Apply of M.S. Grills of various locations of Boiler, APH , ESP & Coal Mill Platform area for Unit No. 1, 2 & 3 of BMD I & Unit No. 4, 5 & 6 of BMD II at WTPS .
& to follow The Motor vehicle Act, 1988,the Central Motor Vehicles (Amendment) Rules,2016 as
Remaining Work of Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps and Iron/ Fluoride/ Arsenic Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the Fluoride affected Habitations/ Wards of Districts of Bihar on turn-key basis with 03 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhmantri Nishchay (Quality Affected) Yojna And Some Yogjna need to be Operation and Maintenance for Four Year and Three Months Under P.H. Division, Munger For Year 2026-27.
1 Boring/drilling bore well of required dia for casing/strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, upto 90 metre depth below ground level. (All types of soil)