Loading…
Loading…
14,880 results • Best match
establishment of pakaged drinking water plant, Production and Supply packed drinking water (Saras Neer) at RCDF units
TENDER FOR THE ESTABLISHMENT OF A PACKAGED DRINKING WATER PLANT TO PRODUCE AND SUPPLY 'SARAS NEER' FOR Cattle Feed Plant, Ajmer (300000 PLACE /PLANT/ /Unit)
PLEASE REFER TO BOQ
Providing and fixing G.I pipes complete with G.I fittings excluding trenching and refilling etc. (external work). Light class.
Improvement works to water supply main pipe line at ward 6 east Zone
Earth work Excavation in all soils for Water Supply Laying work Including Refilling the Excavated Earth etc complete
Parching of Air Valve and purching of water supply matirel Tp hirekerur Ltd
Parching of Air Valve and purching of water supply matirel Tp hirekerur Ltd
Maintaining water supply by deployment of staff at various BPS in Sec 5 and Sec 11 Rohini
Maintain Water Supply – To maintain water supply from various booster pumping station (LT installation) as per prevalent schedule in break duty hrs (Morning & Evening) as per direction of engineer-in-charge by operating all electrical and mechanical equipment, minor maintenance i.e. filling of gland, greasing, replacement of coupling tyre, operation of UGR intake valve, minor maintenance in LT panel etc. & to maintain proper cleanliness of pump house by deploying of semi- skilled/trained staff, 1 no. in day shift break duty, detail of sites is as under 4 Nos. semi skilled:- 1. A-1 Sec 05 Rohini BPS 2. B-5 Sec 11 Rohini BPS 3. 480 SFS Pkt. 10 Sec 11 Rohini BPS 4. E-2 Sec 11 Rohini BPS
Providing Water Supply Arrangements at W.No.6 Paaliyakaadu and MPN Nagar in Kangeyam Municipality
Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.