Loading…
Loading…
14,093 results • Best match
Operation and Maintenance Of ILUABARI Z-I piped Water Supply Schemes in Islampur Block of Uttar Dinajpur district under Raiganj Division, PHE Dte
Operation & Maintenance Of ILUABARI Z-I piped Water Supply Schemes in Islampur Block of Uttar Dinajpur district Under Raiganj Division, PHE Dte [for a Period of 12 (Twelve) Months]
Operation and Maintenance Of SURANGAPUR Zone-I piped Water Supply Schemes in Hemtabad Block of Uttar Dinajpur district Under Raiganj Division, PHE Dte
Operation & Maintenance Of SURANGAPUR Zone-I piped Water Supply Schemes in Hemtabad Block of Uttar Dinajpur district Under Raiganj Division,PHE Dte [for a Period of 12 (Twelve) Months]
Construction of control room building, boundary wall, water supply arrangement and other civil works at 33 KV S/S Didawali (Deeg)
S-2/2.38: Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. (Concealed work including cutting chases and making good the walls etc.,)S-2/2.38.2: 20mm nominal size
Balance work of agreement No. 520 for the year 2020-21 Errection installation and Commissioning of non clog submersible pumps and DG sets at Bhiuli at near Vishwakarma Temple
The work shall be executed as per HPIPH specifications, CPHEEO manual with latest amendments on sewerage and sewage treatment, relevant IS codes and to the entire specification of the Engineer-in-Charge.
Balance work of agreement No 520 for the year 2020-21 Errection installation and Commissioning of non clog submersible pumps and DG sets at Bhiuli near Home Guard Office
The work shall be executed as per HPIPH specifications, CPHEEO manual with latest amendments on sewerage and sewage treatment, relevant IS codes and to the entire specification of the Engineer-in-Charge.
Balance work of agreement No. 520 for the year 2020-21 Errection installation and Commissioning of non clog submersible pumps and DG sets at Suketi Khad (near old Septic tank
The work shall be executed as per HPIPH specifications, CPHEEO manual with latest amendments on sewerage and sewage treatment, relevant IS codes and to the entire specification of the Engineer-in-Charge.