Loading…
Loading…
15,357 results • Best match
Supply and installation of Solar Pump with all accessories LDPE tanks HDPE pipe and Construction of checkdam
Supply ad installion of Solar Water Pumping System capable to deliver 123.81 lpm clear water discharge at 85.08 m total head (7.5 HP capacity) with Monocrystaline Solar Panels with Pumpset controller (EMPPT), panel mounting structure, electrical Accessories and 5 year annual maintenance service etc complete.
Laying of DI pipe line and providing of Pumping Machinery in village Singar
Operation and guarding of Pumping Machineries at Raw Water Pumping Station at Water Treatment Plant under NTK Water Supply Project.
N.B.:- Work should be completed as per attached Terms & Conditions.
Supply of needed equipment and maintenance of lift irrigation scheme
Supply of mechanical,Electrical and other equipments for maintenance and operation of Dabbeghatta LIS for the year 2026-27
DETAILED PROJECT REPORT FOR PROVIDING SEWERAGE FACILITY and SEWAGE TREATMENT PLANT MUNAK DPR FOR AUGMENTATION OF W/S SCHEME MUNAK BY INSTALLATION OF TUBE WELLS and LAYING THE DI PIPE LINES IN VILLAGE MUNAK DISTRICT KARNAL UNDER SWARAN JAYANTI MAH
(PART-A):- MUNAK VILLAGE DISTT. KARNAL: W/S SCHEME “Installation of Tube wells, pump chamber, boundary wall, Laying the distribution lines and house connectionincluding Operation and Maintenance cum defect liability period for 06 years after successful completion of 3 Months trial run period complete in all respect. ” (PART–B):-MUNAK VILLAGE DISTT. KARNAL: SEWAGE SCHEME “Laying of sewerage system, construction of manholes, inspection chamber and construction of 2.50 MLD STP(SBR technology based) SCADA / PLC controlled including MPS and IPS comprising wet well sump, boundary wall, pump chamber, Rising Main, staff quarter, PumpingMachinery, DG set etc. including Operation and Maintenance cum defect liability period for 06 years after successful completion of 3 Months trial run period complete inall respect.” (The amount shall be included of complete cost of HSR + N.S. Items + O&M cost)
GENERAL-.-Rectification of the damaged portion of the second aqueduct - removal of the side wall and laying of 600 mm diameter DI pipe, first 40m in 200-meter length, for the first reach in the thudikkal Lift irrigation Project -
appendix B - 600mm dia PIpe aqueduct Laying