Loading…
Loading…
15,357 results • Best match
Reusing the treated water from the Gabbur Sewage Treatment Plant and restore water resources in Kempakere within the limits of the 72-Vidhan Sabha constituency of the South Division of Hubballi City
Reusing the treated water from the Gabbur Sewage Treatment Plant and restore water resources in Kempakere within the limits of the 72-Vidhan Sabha constituency of the South Division of Hubballi City
Construction of Lift Irrigation Scheme Reban Rafiabad.
Rising Main: Providing, Laying, fitting and testing of Mild Steel Pipe of 450mm NB with 5 mm wall thickness. The pipes shall be painted in two coats of anticorrosive bituminous paint over one coat of steel primer. The overall specification of the pipe shall be as under: Nominal bore. = 450mm Wall thickness = 5 mm Type of welding = ERW Grade = Fe410 Length of each pipe = 6m Pipe to be manufactured as per IS-3589 with latest amendments The Pipes shall be laid and connected end to end by required welding using high quality Electrodes of Ador/ Essab in 2 Runs and the weld shall be of smooth finish and free from defects. All tools and tackles for laying and fitting of pipe shall be arranged by the firm. Make: Tata/Jindal/Suryaprakash/Equivalent as approved in EOI of SE Mech. Circle Kashmir. Pipe Manufacturers test certificate to be appended.
Supply of water Chemicals for treatment of water at HQ IGAR (East) at Srikona
Supply Only Calcium Hypochlorite and deposioted to HQ IGAR (East) store.
Construction of 0430 MLD Sewage Treatment Plant based on Biodigester, Rootzone Technology
Construction of Sewage Treatment Plant of 0.430 MLD capacity based on Biodigester and Rootzone Technology with constructed wetland (Rootzone system), including evolving of hydraulic & structural designs & drawings, planning, testing and commissioning of treatment facility. The Sewage Treatment Plant should be capable of treating domestic raw sewage having characteristics of BOD =350 mg/litre & suspended Solids =650 mg/litre and the characteristics of treated /disposable effluent should comply with the standards as per the norms of H.P. State Pollution Control Board i.e. PH = 6.5- 9, BOD ≤ 10 mg/litre, COD ≤ 50 mg/litre, TSS ≤ 50 mg /litre, Faecal Coliform (MPN /1000 ml) 100, N - Total N ≤ 10 mg/litre, NH4 - N ≤ 5 mg/litre. The scope of work includes construction of Inlet Chamber (1 No.), Screen Chamber (2 No.), Grit Channel (2 No.),oil and grease chamber 1no.,parshall flume, Distribution Box (1 No.), Biodigester system, Aerobic Treatment system, Sludge Drying Beds, constructed wet land (Rootzone), multi media filter, chlorine contact tank with required arrangement, walk ways, , Interconnectivity pipe of STP units & Effluent Pipe for disposal of treated waste, Boundary wall with Fencing Panel around the S.T.P Yard (P&F), Steel Gate (P&F), Interconnecting Path, Railing and Access Ladder, Plant Building/Chowkidhar Room and pump house (plinth area of all buildings 80.50 sq.m.), providing and installation of Electro - Mechanic Equipment’s, Generator set of required capacity,Providing and fixing of yard lighting around STP, with in all leads and lifts at site complete in all respect as per the entire satisfaction of Engineer-in-charge (as per chapter No. vi(a), vi(b), vi (c). 3 Months of successful trial run as per the provisions of Manual on Sewerage & Sewage Treatment published by CPHEEO Manual (Latest edition).
Operation and Maintenance Services for Water Supply, Raw Water Pump Station and Water Treatment Plant at DRDO Complex, Ojhar, AMBE Hill, Nasik
OPERATION AND MAINTENANCE OF WATER SUPPLY, RAW WATER PUMP STATION AND WATER TREATMENT PLANT AT DRDO COMPLEX,OJHAR (AMBEHILL, NASIK. (Percentage Rate Schedule for Item No . 1.01 Only)
Renovation of 27.0 MLD Water Treatment Plant at Hajipur for supply of potable water to NMC Based Sidhdhi Sarovar RWSS. Ta.Patan Di.Patan Under M and R to Sidhdhi Sarovar RWSS (2nd Attempt)
VOLUME-III Renovation of 27.0 MLD Water Treatment Plant