Loading…
Loading…
15,357 results • Best match
Operation and guarding of Pumping Machineries at Clear Water Pumping Station at Water Treatment Plant (Phase-I) under NTK Water Supply Project.
N.B.:- Work should be completed as per attached Terms & Conditions.
Supply of Alummina-Ferric, (Grade-IV) of Water Treatment Plant Process of Surface Water Based Arsenic Free Water Supply Scheme at BALUPUR Water Supply Scheme under Malda Division, PHE Dte. In the district of Malda. (2nd Call)
Supply of Alumina-Ferric, (Grade-IV) of Bengal Chemical Pharmaceutical Ltd. A Govt. of India Enterprise of similar make as per ISI 299/1898 Water soluble Aluminum compounds as Al2 percent by mass-16.0 Min. in terms with IS 299:1989 of amended for using as coafulant in Water Treatment Process within Balupur Water Treatment Plant Premises under Malda Division, PHE Dte. In the district of Malda. (Loading, Unloading GST & CESS Including).
Custom Bid for Services - O&M of Water Treatment Plant of NTS -2026-28 Similar Category Operation And Maintenance Of Water Supply Systems
Custom Bid for Services - O&M of Water Treatment Plant of NTS -2026-28 Similar Category Operation And Maintenance Of Water Supply Systems
Construction of road with WMM DBM BC etc Construction of foothpath potable water network sewarage network waste water treatment network and storm water drainage network.
Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations: a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment. b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineerin-charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand ) admixed with water proofing compound conforming to IS : 2645 and approved by Engineerin-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs. c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge. d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement :4 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep. e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test.“All above operations to be done in order and as directed and specified by the Engineer-in-Charge : With average thickness of 120 mm and minimum thickness at khurra as 65 mm.
Repair of Pump Chamber, Repair of OHSR,Providing and Laying Pipe Line, FHTC, Construction of Footpath Etc.
AUG. WATER SUPPLY SCHEME NANGAL OF BLOCK & DISTT. BARNALA. Repair of Pump Chamber, Repair of OHSR, Providing & Laying Pipe Line, FHTC, Construction of Footpath Etc.
Estimate for the Construction of Boundary wall of Kathgarh Lift Irrigation Scheme
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil