Loading…
Loading…
15,482 results • Best match
Supplying and Laying of 150mm dia DI dedicated sewer main from GT Cholai Apartment to Padikuppam old SPS in Depot 93, Area VII
Supplying and Laying CI pipes LA class pipe including earthwork excavation for trenches in hard stiff clay, blackcotton, hard red... hard gravelly soil depositing the earth on banks with initial lead of 10m and initial lift of 2m carting the pipes from any of the Board's Stores to the site of work lowering into the trenches, and aligning, refilling the trenches with excavated soil, ...
Work of construction of Sources, rising main pipelines, RCC Reservoir, internal village distribution pipeline and FHTC including one year Defect Liability period of Village SHAHJAHANPUR under Subdivision Neemrana under JJM in the jurisdiction of PHED
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches for water supply pipe lines, shoring and strutting if required as per required gradient and line including ...
Construction of Limited Height Subway at Level crossing no 415B (Shankargarh Yard) and other connected works.
... nominal size of Recycled Concrete Aggregate (RCA) upto 20%. Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string... nominal size Recycled Concrete Aggregate (RCA) upto 20% 5.3 Reinforced cement concrete work in cum 200 10719.3 2143860 beams, suspended floors, roofs having slope up to 15 degree ...
Providing Storm Water Drains Integrated with Waterbodies in Hosur City Municipal Corporation - Package-3
Supply, Installation, Erection of power pumps in borewell labour charges for erection of twin packer duplex type jet pumps in borewells upto 150 mm dia including fixing of Suction pipe regulating valves with jet assembly upto a maximum depth of 30 m and delivery pipe valves ...
SPL REPAIR TO BLDG NO T-32 AND T-35 OF 4 MARATHA LI BLDG NO T-15 OF 327 FD REGT AND BLDG NO T-87 OF 8 MAHAR AT DRAS UNDER GE KARGIL
M&L for 20mm 3-layer PP-R Polypropylene random copolymer) concealed pipes SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded Polypropylene random fittings fixed complete to walls, ceilings or in floors etc.
Repair/renovation/upgradation for civil work in Veterinary Hospital Complex Palam (Balance work).
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
CONSTRUCTION OF 50 BED HOSTEL AT BOYS RESIDENTIAL UPGRADED HIGH SCHOOL SINGHPURA LALKOTA GURABANDHA EAST SINGHBHUM.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
SPECIAL REPAIR OF BLDG NO T196 OFFICE SHELTER OF 267 SATA BATTERY AT HYMG SUMDO UNDER GE 863 EWS
S&F 16mm bore of pipes in 3- layer PP-R Polypropylene random copo lymer) conceal ed pipes SDR 7.4 (PN16) UV stabi lized and antimi crobial fusion welded having thermal stability for hot & cold water supply all PP-R plain & brass threaded polypropylene random fittings laid in trenches complete all as specified
04-Renovation and Construction of Middle School Putki No. 10, Block Dhanbad, Dist. Dhanbad.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
Fault detection and Rectification of HT and LT Underground cables at Carriage Workshop, Alambagh, Lucknow
Horizontal Directional drilling (HDD) / Boring and trenchless cabling, Supply, Transportation and insertion of self lubricated HDPE pipe and laying of cables in boring under the 8 track/road/ground/Masonary building by using self self... boring under the 8 track/road/ground/Masonary building by using self self lubricated HDPE pipe of 120mm outer dia and 103.5 mm inner dia in the bore under the track / road/ ground/ ...